- Roberts-Gordon The Economical, Unitary Infrared Heater Installation, Operation and Service Manual

ROBERTS GORDON
®
BH-SER I ES SUBMITTAL SHEET
© 2004 Roberts-Gordon
BEFORE IN STALLATION AND OPER ATION OF HEATING E QUIPMENT, READ AND U NDERSTAND THE INSTALLATION, OPERATIO N AND SERVICE MANUAL.
APPLICATION S, ENGI NEERING AND DETAILED GUID ANCE ON SYSTEMS DESIGN, INSTAL LATION AND PRODUCT PERFORMANCE IS AVAILABLE UPON RE QUEST. ROBERTS GORDON
®
PRODUCTS ARE TO BE
INSTALLED ONLY IN ACCORDANCE WI TH L OCAL LAWS, CODES AND REGULATIONS, AND ONLY BY A CONTRACTOR QUALI FIE D IN THE INST ALLATION AND SE RVICE OF GAS-FIRED HEATING EQUI PME NT.
BH-Series U-Tube Layout Overviews (Continued)
BH-200
BH-175
BH-200
BH-140
BH-150
BH-175
BH-200
g
c
b
de
h
e
f
g
c
b
de
h
e e
g
c
b
de
h
e
60' Tube Length
70' Tube Length**
80' Tube Length