- Roberts-Gordon The Economical, Unitary Infrared Heater Installation, Operation and Service Manual

ROBERTS GORDON
®
BH-SER I ES SUBMITTAL SHEET
© 2004 Roberts-Gordon
BEFORE IN STALLATION AND OPER ATION OF HEATING E QUIPMENT, READ AND U NDERSTAND THE INSTALLATION, OPERATIO N AND SERVICE MANUAL.
APPLICATION S, ENGI NEERING AND DETAILED GUID ANCE ON SYSTEMS DESIGN, INSTAL LATION AND PRODUCT PERFORMANCE IS AVAILABLE UPON RE QUEST. ROBERTS GORDON
®
PRODUCTS ARE TO BE
INSTALLED ONLY IN ACCORDANCE WI TH L OCAL LAWS, CODES AND REGULATIONS, AND ONLY BY A CONTRACTOR QUALI FIE D IN THE INST ALLATION AND SE RVICE OF GAS-FIRED HEATING EQUI PME NT.
Turbulator Installation
Reflector Installation
T
w
i
s
t
Pull String
Tab
Fold tab around outside
of tube nearest to the vent to hold turbulator
in place. Where a vent sleeve
is used, do not fold tab.
Turbulator
2.5' Section
Turbulator
Adapter
Description Part Number
Turbulator Adapter 03051503
Turbulator 2.5’ Sect ion 03051504
Tube 91409XX X
Turbulator must be installed in the last
standard section of tube. Turbulator is
not required on the BH-125/150/175/200.
Turbulator Installation
Model Tube Section
BH-40 1st 10 Section
BH-60 2nd 10 Section
BH-80 2nd 10 Section
BH-100 3rd 10’ Section
BH-115 3rd 10’ Section
BH-125 N/A
BH-140 4th 10’ Section
BH-150 N/A
BH-175 N/A
BH-200 N/A
Hanger
Burner Tube
Reflector
Description Part Number
Tube/Reflector Hanger 03090100
Burner Tube 03051XXX
Refle ctor 02750303
NOTE: All tube surfaces must be covered
by a reflector, except for a U-Tube.