- Roberts-Gordon The Economical, Unitary Infrared Heater Installation, Operation and Service Manual

ROBERTS GORDON
®
BH-SER I ES SUBMITTAL SHEET
© 2004 Roberts-Gordon
BEFORE IN STALLATION AND OPER ATION OF HEATING E QUIPMENT, READ AND U NDERSTAND THE INSTALLATION, OPERATIO N AND SERVICE MANUAL.
APPLICATION S, ENGI NEERING AND DETAILED GUID ANCE ON SYSTEMS DESIGN, INSTAL LATION AND PRODUCT PERFORMANCE IS AVAILABLE UPON RE QUEST. ROBERTS GORDON
®
PRODUCTS ARE TO BE
INSTALLED ONLY IN ACCORDANCE WI TH L OCAL LAWS, CODES AND REGULATIONS, AND ONLY BY A CONTRACTOR QUALI FIE D IN THE INST ALLATION AND SE RVICE OF GAS-FIRED HEATING EQUI PME NT.
BH-Series Linear Layout Overview (Continued)
Burner Tube Installation
BH-175
BH-200
BH-140
BH-150
BH-175
BH-200
BH-200
g
c
b
de
f
e e e e
g
c
b
de
f
e e e e e
g
c
b
de
f
e e e e e e
60' Tube Length
70' Tube Length
80' Tube Length
Weld Seam
must be to the
bottom of the tube.
S Hook
Burner Tube
Hanger
NOTE:
Tubing requires a downward
slope of 1/2" (13 mm)
per 20' (6 m) away
from burner.
7' 6" ± 1'
(229 cm ± 25cm)
Offset mounting
hole must be
to the top
Description Par t Number
Burner Tube 03051XXX
S-Hook 91907302
Tube/Ref lector Hanger 03090100