Service manual
EP-200 SERIES PUMP INSTALLATION, OPERATION AND SERVICE MANUAL
4 of 27
SECTION 3: UNPACKING THE PUMP
3.1 Open Shipping Cartons
Open cartons and remove packing inserts. Carefully
remove pump components from the cartons. Lift
assembly by gripping metal pump frame. Two people
are required (weight 112 lb, 51 kg). This pump has
been tested prior to packing. The impeller was
dynamically balanced before assembly and requires
care in handling to avoid damage.
WARNING
Cut/Pinch Hazard
Wear protective gear during installation,
operation and service.
Edges are sharp.
Failure to follow these instructions can result
in injury.