Installation Guide

ASSEMBLY INSTRUCTIONS FOR YOUR
717Page 1 of 2
ASSEMBLY INSTRUCTIONS
SPUTNIK VERTICAL PENDANT
IMPORTANT SAFETY INSTRUCTIONS:
*These instructions are provided for your safety. It is very important that they are read completely before beginning the
installation of your xture.
*Turn o power at switch before replacing bulbs, making sure xture has had sucient time to cool down.
*If any special control devices are used with this xture, follow the instructions carefully to assure full compliance with
N.E.C. requirements. If there are any questions, contact a qualied electrical contractor.
*WE STRONGLY RECOMMEND INSTALLATION BY A LICENSED ELECTRICIAN.
*This xture has been UL rated for dry locations.
** To clean, use soft cloth only. Do not use any chemical or abrasive cleaners as they can damage the nish.**
1. SHUT OFF THE MAIN ELECTRICAL SUPPLY AT FUSE BOX/ CIRCUIT BREAKER.
2. Remove all parts from carton. Do not throw away any parts.
3. Remove cross bar (A) (with threaded tube (C) and hang straight (F) attached) from canopy (D). Do this by unthreading
collar (E) from hang straight (F). Canopy (D) will slip over hang straight (F). Set the canopy (D) and collar (E) aside.
4. Ax cross bar (A) (with threaded tube (C) and hang straight (F) attached) to ceiling outlet box using mounting screws
(B) provided.
5. Measure desired drop for xture to hang and add/remove extension tubes (I) to reach desired position. Guide wiring
through extension tubes before threading tubes together. **TO ADD/ REMOVE EXTENSIONS: (Un)Thread the
threaded tube of one extension out of/ into the threaded opening of the next extension. Make sure wiring is pulled tight
when threading extensions together to prevent damage to the wire.**
7. Thread bottom extension tube (I) onto housing (J).
8. Secure quick link (G) to hang straight (F) and loop (H).
9. Guide the wires exiting xture through the center of collar (E) and canopy (D). Continue to guide the wires through the
links of chain (H), through the center of hang straight (F) and up through the center of threaded tube (C).
10. Cut the cord to the desired length to make electrical connections. Note: at least 18 inches of wire will be needed for
proper connections. Make proper electrical connections described in steps 11-13. A LICENSED ELECTRICIAN IS
RECOMMENDED.
11. Attach ground wire from xture (green or silver in color) to ground wire from outlet box. Fasten wires together with
wire nut (N) and tightly wrap connection with electrical tape.
12. Attach hot wire from xture (black in color or smooth side of wire) to hot wire from outlet box. Fasten wires together
with wire nut (N) and tightly wrap connection with electrical tape.
13. Attach neutral wire from xture (white in color or ribbed side of wire) to neutral wire from outlet box. Fasten wires
together with wire nut (N) and tightly wrap connection with electrical tape.
14. Carefully push wire connections back into ceiling outlet box.
15. Slide canopy (D) up extensions (I) and hold ush against ceiling. To secure position of canopy (D), slide collar (E) up
the extensions and thread it onto hang straight (F). Turn until hand tight.
16. Thread short arms (L) and long arms (M) into housing (J) according to arm placement diagram on page 2.
17. Install twenty 40W MAX. G, Candelabra base bulbs into the sockets (K).
18. Reconnect main electrical supply from the fuse box/circuit breaker and test the xture.

Summary of content (2 pages)