Installation Guide
1200
ASSEMBLY INSTRUCTIONS:
* These instructions are provided for your safety. It is very important that they are read completely
before beginning the installation of your xture.
* WE STRONGLY RECOMMEND INSTALLATION BY A LICENSED ELECTRICIAN.
* Turn o power at switch before replacing bulbs
* If any special control devices are used with this xture, follow the instructions carefully to assure full
compliance with N.E.C. requirements. If there are any questions, contact a qualied electrical
contractor.
* This xture is UL rated for dry locations.
IMPORTANT SAFETY INSTRUCTIONS:
1. SHUT OFF THE MAIN ELECTRICAL SUPPLY AT FUSE BOX/ CIRCUIT BREAKER.
2. Remove all parts from carton. Do not throw away any parts.
3. Remove quick link (G) from hang straight (F). Keep quick link (G) attached to loop (H).
4. Remove cross bar (A) (with threaded tube (B) and hang straight (F) attached) from canopy (D). Do this by
unthreading collar (E) from hang straight (F). Carefully slide collar (E) down extensions (I) until it rests on
threaded tube (J). Slide canopy (D) over hang straight (F) and down extensions (I) until it rests on collar (E).
5. Ax cross bar (A) (with threaded tube (B) and hang straight (F) attached) to ceiling outlet box using screws
(C) provided.
6. Measure desired drop for xture to hang and add/remove extension tubes (I) to reach desired position. Guide
wiring through extension tubes before threading tubes together. **TO ADD/REMOVE EXTENSIONS:
(Un)Thread the threaded tube of one extension out of/ into the threaded opening of the next extension. Make
sure wiring is pulled tight when threading extensions together to prevent damage to the wire.**
7. Thread bottom extension tube (I) onto threaded tube (J).
8. Lift xture to ceiling and secure quick link (G) to hang straight (F). Carefully guide wire through hang
straight (F) and threaded tube (B) into ceiling outlet box.
9. Make proper electrical connections noted in steps 10-12. A LICENSED ELECTRICIAN IS
RECOMMENDED.
10. Attach ground wire from xture (green or silver in color) to ground wire from outlet box. Fasten wires
together with wire nut (N) and tightly wrap connection with electrical tape.
11. Attach hot wire from xture (black in color or smooth side of wire) to hot wire from outlet box. Fasten
wires together with wire nut (N) and tightly wrap connection with electrical tape.
12. Attach neutral wire from xture (white in color or ribbed side of wire) to neutral wire from outlet box.
Fasten wires together with wire nut (N) and tightly wrap connection with electrical tape.
13. Carefully push wire connections back into ceiling outlet
box.
14. Slide canopy (D) up extensions (I) and hold ush
against ceiling. To secure position of canopy (D), slide
collar (E) up extensions (I) and thread it onto the hang
straight (F). Turn until hand tight.
15. Install eight (8) 40W MAX. Type G, candelabra base
bulbs into the sockets (L).
16. Thread acrylic rods (K) into housing (M) to complete
assembly. See acrylic rod placement diagram on page 2.
Note: Grasp acrylic rods at base, near threads to avoid
damage to acrylic and cap. Do not force rods into
housing. If you experience diculty threading a rod
into the housing at chosen spot, don’t try to force the
parts to thread together. Instead, try threading the rod
into a dierent opening in the housing.
***To clean, use soft cloth only. Do not use any chemical or abrasive cleaners.***
(I)
(I)
(J)
(H)
(I)
(A)
(B)
(C)
(D)
(E)
(F)
(G)
(N)
(I)
(K)
(L)
(M)
ASSEMBLY INSTRUCTIONS FOR YOUR
ANDROMEDA OVAL CHANDELIER
Page 1 of 2


