Installation Sheet
7
© 2017 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376 www.robern.com
Installation or Assembly Instructions
Part no. 209-1292-rC rev. 07/13/18
Profiles Modular Light
STEP 3 - IN BETWEEN LIGHTING
Assemble light(s) and cabinet(s) together on a at level surface.
Note: You will need to purchase the MGKIT Ganging Kit for multiple cabinet congurations.
1. For in-between lighting, use the standard pan head Screws [203-1247] included in the light hardware bag, and attach the Connecting
Blocks, working from inside the cabinet (Fig. 1).
2. Using a 5/16” wrench or small socket wrench, attach the Light Case to the Connecting Blocks using Hex Head Screws [203-1363]
included in the light hardware bag. Using screws [SS676], included in the MGKIT, attach the connecting block to the cabinet (Fig. 2).
Important: The Ganging method shown is different from what is shown in the M / PL / Proles instruction manual.
2
1
MGKIT for ganging
(4) Connecting Block
(2) Z Mounting Bars
[203-1349]
(18) Wall Anchors
[SS712]
(9) Top Clip
[SS676]
(18) #10 x 1/2" Screw
[SS672]
(18) Screw Cap
[SS674]
(18) #10 x 2" Screw
203-1247
203-1363 SS676
MGKIT