Installation guide

RO-MAN REVERSE OSMOSIS SYSTEM INSTALLATION GUIDE
8
S
TARTING THE SYSTEM FOR THE FIRST TIME
MAKE SURE ALL WATER SUPPLY / DRAIN LINES ARE SECURE AND FREE FROM LEAKAGE. BY SLOWLY TURNING THE SADDLE
VALVE COUNTER CLOCKWISE UNTIL FULLY OPEN
. CHECK SEAL FOR LEAKAGE. IF NECESSARY, TIGHTEN STEM NUT LIGHTLY.
IMPORTANT NOTE:
DO NOT USE THE FIRST 10 GALLONS OF WATER
DISPENSE THIS WATER TO DRAIN. THIS PROCESS REMOVES THE FACTORY INSTALLED SANITIZING SOLUTION
FROM THE ENTIRE SYSTEM AND SENDS IT TO THE DRAIN
. DO NOT DRINK THIS WATER!
M
AINTENANCE- IMPERATIVE TO FOLLOW THE SEQUENCE AS OUTLINED
F
LUSHING THE SYSTEM WITH THE FLUSH VALVE
ALL
RO-MAN SYSTEMS ARE FITTED WITH A FLUSH VALVE, THIS VALVE IS TO EXTEND THE LIFE OF THE
MEMBRANE
, THE MORE OFTEN YOU CAN PUT THE SYSTEM IN FLUSH MODE THE BETTER. DAILY FLUSHING IS
BEST BUT WEEKLY IS OK
. ALL YOU NEED TO DO IS OPEN THE FLUSH VALVE FOR 2-3 MINS EACH TIME, THIS LETS
THE WATER BLAST AWAY ANY BUILD UP IN THE MEMBRANE
.
WHEN
TO REPLACE THE PRE-FILTERS
S
EDIMENT PRE-FILTER SHOULD BE CHANGED WHEN EVER CHANGING ANY OTHER FILTER OR WHEN IT LOOKS
CONTAMINATED OR IF YOU GET REDUCED PRESSURE
C
ARBON FILTER AND CCB FILTERS SHOULD BE CHANGED EVERY 16666 GALLONS OF WATER THROUGH PUT
OR ON THE
300 GPD SYSTEM EVERY 8000 GALLONS OF PRODUCT WATER AND ONE THE 200 GPD SYSTEMS
EVERY
5000 GALLONS OF PRODUCTION.
ALL
PRE-FILTERS SHOULD BE CHANGED EVERY 6 MONTHS IF WATER CAPACITY IS NOT REACHED
C
HANGING THE PRE-FILTERS
1.) T
URN THE WATER OFF BY SLOWLY TURNING THE SADDLE VALVE CLOCKWISE.
2.) R
EMOVE THE PRE-SEDIMENT
3.) R
EMOVE THE CARBON CARTRIDGE
4.) R
EMOVE THE CBR2 CARTRIDGE
5.) I
NSTALL THE NEW FILTERS AND RE-ASSEMBLE SYSTEM.
6.) T
URN ON THE SYSTEM AND INSPECT FOR LEAKS.
RO-MAN.COM LTD Page 8 of 15