Instruction manual

40
Section 4 - In Roof Frame Installation
Mounting Lower Flashings
Starting from left side, screw lower left ashing (3) at left end to lower slat (2) with screws 4x30 (23).
Mount rest of lower ashing (4/5/6) continuing left to right, push ashing together and t with screw
(23) to lower wooden slat (2) where the overlap and on right end. (The ashings must interlock with
each other). When nished stick the seal strip at top of ashing edge (7) (covering the screw heads)
across total length.
3
4
4
5
7
23
5
6