User's Manual

Document:
TBD
Page:
34 of 42
ENGINEERING
Documentation
Revision:
1.6
Date:
24-May-17
Title:
TND540 Requirement
Proprietary and Confidential
This document contains confidential and property information which belongs to Rand McNally, Inc. This
document may not be copied, reproduced, or transmitted to others in any manner, nor may any use of the
information on this document be made, except for the specific purposes for which it is transmitted to the
recipient without prior written consent of Rand McNally, Inc.
4.3.2 Operational Shock
The product shall operate in accordance with this specification before and after exposure to the shock test
defined in MIL-STD-202G Method 213B (test condition A). This test shall be performed using a half-sine pulse
of 50 gs (peak) for duration of 11 ms. Three shocks in each direction shall be applied along each of the three
mutually perpendicular axes of the unit for a total of 18 shocks. The unit shall be verified to be operating
properly before and after the test. The unit shall also be inspected for damage and mechanical fatigue at the
conclusion of the test. A total of 2 units shall be used for this test.
PDF 檔案使用 "pdfFactory Pro" 試用版本建立 www.pdffactory.com