Manual

15 • Beacon 200 Rig Monitor Operator’s Manual
1. Select the mounting site. When you select the mounting site consider
the following factors:
Can the 12 VDC battery be installed within 50 feet of the Rig
Monitor?
Is there enough room to open the housing door and make wiring
connections through the conduit hubs at the bottom of the housing?
Are the display screen and status lights visible?
PILOT
FAI L
Ø .31 x .50 slot, 4X
8.0 Ma
x
Mounting
Feet, 4X
7.00
3/4 Conduit
Hubs (4X)
3/4 Cable
Bushings (3X)
Buzzer
RESET
AL AR M 1
AL AR M 2
.41
Reset
Switch
6.45
10.94
10.50
6.00
8.50
4.83
GAS MONITOR
BEACON 2 00
Figure 7. Rig Monitor Outline and Mounting Dimensions