Manual
15 • Beacon 200 Rig Monitor Operator’s Manual
1. Select the mounting site. When you select the mounting site consider
the following factors:
• Can the 12 VDC battery be installed within 50 feet of the Rig
Monitor?
• Is there enough room to open the housing door and make wiring
connections through the conduit hubs at the bottom of the housing?
• Are the display screen and status lights visible?
PILOT
FAI L
Ø .31 x .50 slot, 4X
8.0 Ma
x
Mounting
Feet, 4X
7.00
3/4 Conduit
Hubs (4X)
3/4 Cable
Bushings (3X)
Buzzer
RESET
AL AR M 1
AL AR M 2
.41
Reset
Switch
6.45
10.94
10.50
6.00
8.50
4.83
GAS MONITOR
BEACON 2 00
Figure 7. Rig Monitor Outline and Mounting Dimensions