Owner manual

Beacon 200 Rig Monitor Operator’s Manual 14
1. Select the mounting site. When you select the mounting site consider
the following factors:
Can the 12 VDC battery be installed within 50 feet of the Rig
Monitor?
Is there enough room to open the housing door and make wiring
connections through the conduit hubs at the bottom of the housing?
Mounting
Feet, 4X
8.0 Ma
x
Ø .31 x .50 slot, 4X
R ESET
Buzzer
3/4 Cable
Bushings (3X)
3/4 Conduit
Hubs (4X)
.41
FA I L
PILOT
Reset
Switch
7.00
6.45
AL AR M 2
AL AR M 1
4.83
8.50
6.00
10.50
10.94
BEACON 200
GAS MONITOR
Figure 6. Rig Monitor Outline and Mounting Dimensions