11 Beacon 110 Rig Monitor Operator’s Manual
Chapter 3: Installation & Startup
Overview
This chapter describes procedures to mount the Beacon 110 Rig Monitor, make wiring connections
to the monitor, and start up the monitor.
WARNING: Perform all installation and start-up procedures in a “fresh air” environment
(environment known to be free of toxic gas, and of normal oxygen content). The
Beacon 110 Rig Monitor is not in operation as a gas monitoring system until the
start-up procedure is complete.
Mounting the Beacon 110 Rig Monitor
Perform the following procedure to install the instrument housing at the mounting site.
Figure 5: Beacon 110 Rig Monitor Outline & Mounting Dimensions
RESET
ALM 1FAIL
BEACON 110
GAS MONITOR
ALM 2
4.00 MTG
4.83
Ø .30 X .50SLOTS(4X) MOUNTING
Door Latches
3.03
3/4 Cable
Bushings
(2X)
3/4
Conduit
Hubs (3X)
4.50"
5.6
1.47
10.00
1.70
8.0" Max
7.20
8.50
8.94 MTG