Manual

61-1000RKSS-05 Combustible Gas Detector 3
Installation
This section describes procedures to mount the combustible gas detector in the
monitoring environment and wire the detector to a controller.
Mounting the Combustible Gas Detector
1. Select a mounting site that is representative of the monitoring environment. Consider
the following when you select the mounting site.
Select a site where the detector is not likely to be bumped or disturbed. Make sure
there is sufficient room to perform start-up, maintenance, and calibration
procedures.
Select a site where the target gas is likely to be found first. For lighter gases,
mount the detector near the ceiling; for heavier gases, mount the detector near the
floor.
Figure 2: Mounting the Combustible Gas Detector
2. At the mounting site you select, hang or mount the junction box with the detector
facing down (see Figure 2).
2.40
3.15
3.66
.75
J-Box
Text Oriented
This Way
.20 Dia. x .45
Slot, 2X
3/4 NPT
Female,
2X
RKI Ins truments , Inc.
33248 Central Avenue
Union City, CA 94587
Ex d IIC IP66
Ta=-40°C to +80°C.
C US
II 2 G
Ex d II C IP66
Ta=-40°C to +80°C
KEMA 08ATEX0 167U
0344
WARN ING: SEAL W ITHIN 1 8 INCHES
Class I,Div 1 Gr. BCD Class II Gr.
EFG
Cla s s I , Zone 1 Ex d IIC IP66
AEx d IIC IP66
Enclosure Type 4X
DO N OT OPEN W HI LE ENERGIZED
3/4 x 1/2 Reducing Bushing
Combustible Detector
3.34
7.40 MAX