Operating instructions
Rev 08/24/10 ENERGY KING™ Wood/Coal Boiler Owner’s Manual U. S. 13
Installation
6. Draft System.
a. Insert the conduit leading from your draft system
into the control box and tighten screw to secure.
b. Mount the pre-wired forced air draft blower to the
draft opening located next to the ash removal door
on the lower left front of the Boiler and secure
using the bolts found on the draft opening.
7. Pressure-Temperature Gauge. Insert the Pressure-
Temperature Gauge into the right-front receptacle
located on top of the Boiler.
8. Pressure Relief Valve. Insert the Pressure Relief
Valve into either the left-middle or right-middle
receptacle located on the top of the boiler. The
Pressure Relief Valve must be plumbed with a
discharge tube that empties into a floor drain. See
Plumbing for further instructions.
Figure 4: Forced Air Draft Blower
Figure 3: Control Box for Forced Air Draft