Instructions / Assembly
STEP 9
1. Attach the pre-assembled top shelf (7) and rail boards to right side frame (13) by inserting 2 machine screws
(B) through holes on top shelf left rail board (1) and tighten to right side frame (13).
2. Repeat above steps to assemble middle shelf (8) and bottom shelf (9) to right side frame (13).
3. Attach rear lower back board (11) to right side frame (13) by inserting wood dowels (A) into wood dowels
holes on right side frame (13).
STEP 10
1. Drill 2 holes on wall in desired position and insert 2 plastic anchors (E) into holes.
2. Insert 2 wall screws (D) into plastic anchors (E) and hang wall shelf on wall by aligning screws with brackets on
shelf.