Instructions / Assembly
www.RiteScreen.com | 1-800-949-4174 | InsideSales@RiteScreen.com
1. Remove tape to separate the expanders from both the top and bottom rail pieces (note that the top and
bottom rail pieces containing the expanders are identical to one another, and either can be used at the top
or the bottom).
2. Place the top/bottom rail against the long side piece which contains the corners in both ends (FIG. 4). Make
sure to orient both pieces as shown, aligning the screw holes in the top/bottom piece with the “dimples”
in the corner. Using a Power Drill with a 2.5” #2 driver, install (2) No. 8 x 3/4” screws (the LONGER screws
provided), through the holes in the top/bottom rails and into the corner dimples in the long piece. Then
attach the other end of the top/bottom rail to this long piece similarly. Now attach the other top/bottom rail
to the remaining long sides as before.
STEP 3………Install screen mesh into frame (Scan QR code on mesh bag, (SEE FIG. 5), see instructions on mesh
bag, and/or follow below steps)
1. Place assembled frame on two sawhorses (or a large table) which will support the frame near the extreme
long ends with the at side of the screen laying against the sawhorses. The non-at side of the screen will
then be facing upward so that the groove into which the mesh and spline will be installed is accessible.
2. From the left side of the frame, place the end of the unrolled mesh down onto the frame so that the edges
of the mesh are ush with the edges of both the LONG and SHORT side of the now assembled frame.
IMPORTANT: The strands of mesh should be aligned with the frame so that they are as close to parallel with
the frame as possible throughout the spline/mesh insertion process. Unroll the mesh until it completely
covers the frame (Note: You will likely have more mesh length than you will need).
Figure 5