Installation manual

Rinnai 35 Installation Manual
CHECKLISTS
INSTALLATION AND COMMISSIONING CHECKLIST
Complete the Installation Check List and the Installer details below.
Instruct customer on the Symmetry
®
operation.
Ensure the customer understands the content of this manual.
FINAL CHECKLIST
Advise the customer that during the initial burning period of approximately 2
hours, some smoke and smell may be experienced. During this period the heater
should be operated on ‘High’ and the space being heated should be well
ventilated. It may take up to 20 minutes of operation for the logs to achieve their
full flame pattern and glow.
The mesh dress guard fitted to this appliance reducing the risk of fire and injury
and no part of it should be permanently removed.
For protection of young children or the infirm a secondary guard is required.
Ensure this Operation and Installation manual is left with the customer.
Ensure the Customer understands that:
No part of this appliance should be permanently removed.
Paper or other material must not be burnt in this appliance.
Young children and the infirm should be supervised at all times.
(To be completed by certified Gas Installer) NO / YES
1. Appliance positioned in a suitable location (clearances, combustible clearances,
mantels and surrounds etc).
2. Was a Rinnai approved flue system installed and tested in accordance with the
instructions?
3. Gas pressure checked and set?
4. Has the log set / burn media been installed as per instructions?
5. Appliance tested for correct operation and to ensure no gas leaks?
6. Customer instructed on operating procedure and safety requirements
7. Is the end-user fully aware of operating procedure?
8. Has the Mesh Dress Guard been fitted?