Operating instructions
Table Of Contents

Rinnai New Zealand Ltd. RDV36 Heat Transfer Kit Installaon 11700-E 05-11
10
Fing the ceiling or oor outlets
1. Check position of ceiling or oor outlet to ensure a 450 mm clearance (for a smooth bend in
the duct) and that no ceiling or oor joists are in the way.
2. Scribe with a pencil the position of the ceiling or oor outlet.
3. Ceiling outlet:
- Position white plastic vent and screw into place
- Place the outlet over the vent by clipping into place
Floor grill and transition boot:
- Position outlet in oor and screw into place
- Attach oor transition boot to oor outlet
4. Using the high temperature duct tape, attach (as outlined on p. 8) the 3 m ducting to the
fan and ceiling outlet or oor transition boot. The 3 m length of duct cannot be cut down as
this could create excessive fan noise.
Fitting the ceiling fan and grill