Installation manual
Rinnai Australia 33 Installation Manual
HEATER INSTALLATION
HEATER INSTALLATION OVERVIEW
Step 1). CONSTRUCTING THE FRAME
Step 2). UNPACK THE APPLIANCE AND FASCIA COMPONENTS
Step 3). PREPARING THE APPLIANCE FOR INSTALLATION
Step 4). INSERT AND FIX THE APPLIANCE TO THE FRAME WORK
Step 5). CONNECT FLUE AND INSTALLING THE FLUE RESTRICTOR
*Flue restrictor required for vertical and vertical off-set flue installation.
Step 6. CONNECT THE APPLIANCE TO CONSUMER GAS PIPING
Step 7). INSTALL THE LOG SET
Step 8). REPLACE THE GLASS PANEL ASSEMBLY
Step 9). CONNECT TO ELECTRICITY SUPPLY
Step 10). COMMISSION THE APPLIANCE
Step 11). NOTE: If using the Square Fasica and surround assembly ensure you connect the RJ45 extension
lead supplied with the Square assembly and allow it to dangle outside the heater.
Step 12). COMPLETE THE CLADDING
Step 13). FIT THE SURROUND
Step 14). FITTING THE MESH GUARD & DRESS GUARD FRAME ASSEMBLY
HEATER INSTALLATION - DETAIL
Step 1. CONSTRUCTING THE FRAME
The frame is to be constructed from suitable materials in accordance with local building codes and regulations.
Provisions must be made for gas, electricity and flueing. For details refer to HEATER LOCATION and FLUE
TERMINAL LOCATION and Step 6 below ‘Connecting the appliance to consumer gas piping’.
Step 2. UNPACK THE APPLIANCE
• The heater is supplied in two cartons, check to ensure you have all contents as listed on page (i) at the start
of this manual before proceeding.
• Remove shipping clamps on bottom edge of appliance before attempting to lift heater.
• Carefully remove carton by removing the straps and lifting the *box off the appliance. Remove all packaging
materials and check all components for damage. If any damage is evident DO NOT install or operate this
appliance. Contact your supplier for advice. Before installing the heater, check it is labelled for the correct gas
type, (refer to the data label located adhered to the inside of the base body panel of the heater). Refer to the
local gas authority for confirmation of gas type if you are in doubt. *Note: Retain the card board carton for use
in the next step.
Step 3. PREPARING THE APPLIANCE FOR INSTALLATION
To protect the floor lay the cardboard carton out flat in front of where the heater is to be fitted.
1. Carefully remove the ‘Glass Panel Assembly’ , by removing
the 4 retaining screws top and bottom. Carefully place it safely
aside.
2. Very carefully remove the log set from the combustion chamber
taking care not to scrape the lining or to damage the main
burner.
READ THIS MANUAL THOROUGHLY AND GAIN A FULL UNDERSTANDING OF THE
REQUIREMENTS BEFORE UNDERTAKING INSTALLATION.
This appliance is not supplied with Flue components. These are purchased separately.
Only ‘Abey®’ Flueing components referred to in these instructions can be used.
IMPORTANT
NOTE
5
5