Installation manual
Rinnai New Zealand Limited RDV3610 Installation Manual: 11658-E
05-10
3
Before installation
Unpack the appliance and components and check for damage. DO NOT install any
damaged items.
Check all components have been supplied and that you have the correct gas type.
Read these instructions to get an overview of the steps required before starting the
installation. Failure to follow these instructions could cause a malfunction of the
appliance. This could result in serious injury and property damage.
Description • Direct vent inbuilt gas replace (natural draft)
• Glass front
• Convection fan (top air discharge)
• Remote control, 7-day programmable timer
Recommended for a new build installation into a false (mock) chimney. Not suitable for
retrotting into an existing masonry replace.
Combustion Method Ceramic top pan burner
Data Plate Centre front of base panel (behind the service panels)
Flue
Balanced ue: inner = 100 mm, outer = 170 mm
Appliance must be installed with a Rinnai supplied ue system
Gas Connection ½ “ BSP male are
Gas Type NG and General Product LPG
Heating Area Heats up to 100 m
2
Ignition Integrated sparker to pilot
Input/Output
Input: 19-33 MJ/h
Output: 4.2-7.5 kW
Noise Level 37-45 dB(A)
Power Consumption High 50 W
Standby <1 W
Standard electrical connection is to the right side of the appliance
Safety Devices
Light to pilot, delayed ignition, overheat switch, electronic ame supervision (ame
failure), and combustion chamber pressure relief.
Temperature Control Thermostatic, temperature control range 7-32 °C
Thermal Efciency 80%
Weight 60 kg
Specication