GAS-FIRED VENTED ROOM HEATER VENTED OVERHEAD RADIANT TYPE NOTICE: This manual is current for this product. This publication, or parts thereof, may not be reproduced in any form, without prior written consent from Rinnai. Unauthorized use or distribution of this publication is strictly prohibited. INSPECT PRODUCT UPON RECEIPT Inspect the carton and heater for concealed damage. Note any damage on the Bill of Lading and make any damage claim to the transport company as soon as possible.
GAS-FIRED VENTED OVERHEAD HEATER TABLE OF CONTENTS TOPIC TOPIC ........ PAGE 16. HIGH ALTITUDE INSTALLATION .................. 27 IMPORTANT INFORMATION - READ FIRST 17. LIGHTING INSTRUCTIONS ............. .............27 OPERATING INSTRUCTIONS .......................4 18. RECOMMENDED MAINTENANCE ............. .. 28 SAFETY WARNINGS .....................................5 19. FENWAL DSI: WIRING DIAGRAM ................ 29 START UP ‘SMOKE’ ......................................6 20.
HE Series Infrared Gas Heater Installation and Operation Manual 4
WARNING • Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read and understand this installation and operation manual thoroughly prior to assembly, installation, operation or service to this appliance. • Installation and repair must be done by a qualified service person. The appliance should be inspected before use and at least annually by a qualified service person.
Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read and understand this installation and operation manual thoroughly prior to assembly, installation, operation or service to this appliance. WARNING This heater must be installed and serviced only by a trained gas service technician. Do not store or use gasoline or other flammable vapours and liquids in the vicinity of this or any other gas fired appliance.
WARNING Gas Connection Improper installation, connection, or adjustment can result in property damage, toxic gases, asphyxiation, injury or death. The gas supply must be connected and tested in accordance with all local, state, provincial, and national codes (ANSI Z223.1/NFPA 54 in USA). Refer to Section 13 WARNING Clearance to Combustibles Location of flammable or explosive objects, liquids or vapors close to the heater may cause fire or explosion and result in property damage, injury or death.
HE Series Infrared Gas Heater Installation and Operation Manual 8 TUBE/REFLECTOR MOUNTED HORIZONTALLY Always maintain at least the minimum clearance from any combustible material or vehicle.
TABLE 1 MINIMUM CLEARANCES TO COMBUSTIBLE SURFACES OR MATERIALS* SUSPENDED HORIZONTALLY MODEL SUSPENDED AT AN ANGLE UP TO 30 DEGREES A: TOP C: BELOW S: SIDES A: TOP C: BELOW F: FRONT inches (mm) inches (mm) HE Series 5 (127) 53 (1350) inches (mm) inches (mm) inches (mm) 24 (610) 5 (127) 53 (1350) inches (mm) B: BACK AT 30° B: BACK < 30° inches (mm) inches (mm) 12 (305) 24 (610) 48 (1220) E: ENDS of Reflector : 24” (610 mm) (horizontal or angled) *The clearance to combustible materials re
For your convenience a “peel and stick” sign is provided with this heater. This sign must be posted either adjacent to the IR heating system thermostat or in the absence of such thermostat, in a conspicuous place specifying the required clearances from the heater to the combustibles. WARNING Use a permanent marker to record the required clearance dimensions on the sign.
1. APPLICATION The HE Series heater has been design certified to ANSI Z21.86 / CSA 2.32 Vented Gas-Fired Space Heating Appliances (Vented Overhead Heater). The HE Series heater may be installed for heating of an indoor residential garage, workshop, or greenhouse. This heater can also be installed in light commercial / industrial locations. This heater must not be installed in any dwelling area of a residence, nor in a basement, mobile home, or recreational vehicle.
2. LABOR REQUIRMENTS Two persons are required to safely install this equipment. SHARP EDGES - Wear gloves and other required safety protection. 3. INSTALLATION IN COMMERCIAL AIRCRAFT HANGARS Low intensity radiant tube heaters are suitable for use in aircraft hangars when installed in accordance with the latest edition of the Standard for Aircraft Hangars, ANSI/NFPA No 409 in the USA. A.
6. PRE INSTALLATION SURVEY Carefully survey the area to be heated. It is recommended that a full heating design including heat loss calculation be conducted on the structure or area to be heated. Heater sizing, quantity, and placement must consider available mounting height, sources of greatest heat loss.
9. SUGGESTED GUIDELINES FOR HEATER PLACEMENT* - SPACE HEATING APPLICATION DISTANCE – HEATER LONG AXIS GUIDELINE * PARALLEL TO WALL MOUNTING HEIGHT HORIZONTAL ANGLE MOUNTED ft (m) ft (m) MODEL HE Series 8 – 12 (2.4 - 3.7) MINIMUM: COMBUSTIBLE CLEARANCE BEHIND 5 – 12 (1.5 - 3.7) 12” to 24” (305 to 610 mm) * SUGGESTED GUIDELINE MOUNTING HEIGHTS are typical to provide optimum comfort in general space heating applications.
10. HEATER INSTALLATION Inadequate or improper suspension of the tube heater can result in collapse of the system, property damage, and personal injury or death. Suspend the heater from a structural member that can adequately support the weight of the heater. Always maintain the required minimum clearances to combustible materials and vehicles (see pages 7 to 10).
IMPORTANT: READ FIRST: Review the information on pages 4 to 10 and ensure that installation adheres to the instructions in this manual, and all national and local codes. Refer to pages that follow for illustrations and dimensions that assist in installation. 1. Survey the available structural support, considering the system configuration and heat requirements of the area to establish the optimum heater location. 2. Hardware with a minimum 100 lb.
FIGURE 5 HEATER DIMENSIONS Turbulators (factory installed in tube): Burner side tube: 39” (99 cm) FIGURE 6 HEATER SUSPENSION: HORIZONTAL; UP TO 30° ANGLE 17 HE Series Infrared Gas Heater Installation and Operation Manual
10-A SUGGESTED SEISMIC RESTRAINT - Lateral and Longitudinal Planes NOTE: Seismic restraint requirements vary greatly by geographic region or area. The information below is a guideline only for suspension of the heater. Adhere to specific seismic requirements and specifications of local engineering authority. In areas prone to earthquake, or specified on a project, install lateral and longitudinal seismic restraints as suggested in Figure 7.
WARNING 11. FLUE VENTING Inadequate venting of a heater may result in asphyxiation, carbon monoxide poisoning, injury or death. This heater must be connected to a vent to remove products of combustion from the space. Seal all vent connections with high temperature sealant. Venting must be in accordance with all local, state, provincial, and national codes (ANSI Z223.1/NFPA 54 in USA) and as indicated below in this manual. This heater must be vented directly to the outside.
FIGURE 9 - Horizontal Vent - ALL vent pipe and adapters are field supplied Using Horizontal Vent Terminal 902000002 A wall thimble is not required through a noncombustible wall. Seal pipe penetration. 902000002 (Optional) Seal all vent connections with high temperature sealant. FIGURE 10 - Horizontal Vent Offset Allow free expansion and contraction of the system, and free flow of vent gas.
Horizontal vent through a side wall: (Vertical vent through roof is on page 23) • Refer to General Venting Requirements on page 19 • Seal all vent connections with high temperature sealant. • Minimum length of a horizontal side-wall vent: • Regardless if a 90° elbow is installed, a Minimum linear 36 inch (3 ft; 91 cm) single wall ‘C’ vent plus minimum 12 inch (30.
FIGURE 11: LOCATION OF HORIZONTAL (SIDE WALL) VENT TERMINAL TABLE 3 USA2 Clearance required: A Above grade, veranda, porch, deck, balcony 12” (30 cm) B To a window or door that may be opened 9” (23 cm) C To a permanently closed window D ** Below a ventilated soffit within 2 ft horizontal from center of terminal 9” (23 cm) E Below an unventilated soffit 3” (7.
Vertical vent through the roof: (Horizontal vent through side wall is on pages 20 21) It is the sole responsibility of the installer to adhere to all current local codes and/or ANSI Z223.1 latest editions for all venting requirements, and practices. • Refer to General Venting Requirements on page 19 • Seal all vent connections with high temperature sealant.
12 COMBUSTION AIR REQUIREMENTS Outside combustion air must not be ducted directly to this appliance. Do not install a filter at the combustion air inlet. Make provision to ensure adequate combustion and ventilation air in the space: • USA: In accordance with Section 9.3 ANSI Z223.1 / NFPA-54 for a fan-assisted appliance. Ensure adequate clearance around the air intake (at top of burner cabinet) to allow sufficient combustion air supply to the heater.
13. GAS SUPPLY - GAS CONNECTION … continued Provide a 1/8 in (3.2 mm) NPT plugged tapping, accessible for test gauge connection, immediately upstream of the gas supply connection to the heater. The gas supply should be checked first with heater turned “OFF” followed by another check with heater turned “ON”. This appliance and its main gas valve must be disconnected from the gas supply piping system during any pressure testing of the gas supply piping system at test pressure in excess of 1/2 psi (3.5 kPa).
REQUIRED ORIENTATION OF FLEXIBLE GAS CONNECTOR It is the responsibility of the installer to ensure correct gas connection. Confirm local requirements for gas connection with local authority. Where allowed or required by local code, a flexible gas connector may be used. Refer and adhere to local code requirements and NFPA 54 Section 9.6 (in the USA).
14. GAS CONVERSION WARNING: Gas conversion must only be performed by a trained gas service technician. Do not convert heater to alternate gas without using the proper kit listed below. Property damage, injury or death could result. Standard production of this model heater is for use with natural gas.
18. RECOMMENDED MAINTENANCE Improper adjustment, alteration, service or maintenance can cause property damage, injury or death. This heater must be installed and serviced only by a trained gas service technician. At least annually inspect the entire heater system, venting, and gas supply connections prior to the heating season. Replace worn parts and repair deficiencies. 1. Periodically check the inlet air opening and the blower squirrel cage vanes, cleaning off any lint or foreign matter.
19. FENWAL DSI WIRING DIAGRAM: (FENWAL S87J - PAGE 30; CHANNEL MICRO 50N - PAGE 31) 24V OR 120 VOLT THERMOSTAT - SINGLE HEATER PER THERMOSTAT NOTE: Heater must be controlled by 24Vac Thermostat to enable post-purge by the ignition control. Line voltage control disables the post-purge feature.
P/N: 905000020 20.
21. FENWAL DSI: SEQUENCE OF OPERATION / FLAME RECOVERY / SAFETY LOCKOUT Power Up / Stand By Upon applying 24 volts power to 24VAC, the control will reset, perform a self check routine, initiate full time flame sensing, flash the diagnostic LED for up to four seconds, and enter the thermostat scan state. Heat Mode When a call for heat is received from the thermostat supplying 24 volts to TH, the control checks the pressure switch for normally open contacts.
Flame Fault If at any time the main valve fails to close completely and maintains a flame, the full time flame sense circuit will detect it and energize the combustion blower. Should the main valve later close completely removing the flame signal, the combustion blower will power off following the optional post purge period. Fault Conditions The LED will flash on for 1/4 second, then off for 1/4 second during a fault condition. The pause between fault codes is 3 seconds.
SERVICE CHECKS Multipurpose Meter Flame current passes through the flame from the sensor to ground. The minimum flame current necessary to keep the system from lockout is 0.7 microamps. To measure flame current, connect an analog DC microammeter to the FC- FC+ terminals per figure at right. Use Microamp scale FC- FC+ Meter should read 0.7 µA or higher. If the meter reads below “0” on analog scale, meter leads are reversed. Disconnect power and reconnect meter leads for proper polarity.
This Page Intentionally Left Blank HE Series Infrared Gas Heater Installation and Operation Manual 34
This Page Intentionally Left Blank 35 HE Series Infrared Gas Heater Installation and Operation Manual
This Page Intentionally Left Blank HE Series Infrared Gas Heater Installation and Operation Manual 36
This Page Intentionally Left Blank 37 HE Series Infrared Gas Heater Installation and Operation Manual
This Page Intentionally Left Blank HE Series Infrared Gas Heater Installation and Operation Manual 38
This Page Intentionally Left Blank 39 HE Series Infrared Gas Heater Installation and Operation Manual
26. SPARK IGNITION CIRCUIT The step-up transformer in the ignition control provides spark ignition at 30,000 volts (open circuit). To check the spark ignition circuit, proceed as follows.
28. TROUBLESHOOTING GUIDE WARNING Improper adjustment, alteration, service or maintenance can cause property damage, injury or death. This heater must be installed and serviced only by a trained gas service technician. SEQUENCE OF EVENTS APPLY 120 VOLTS - GREEN LIGHT IS ON NO • REMEDY 120 VOLTS SUPPLY FAULT SET THERMOSTAT TO CALL FOR HEAT COMBUSTION AIR BLOWER STARTS NO NO YES AIR PROVING SWITCH HAS CLOSED 24 VOLTS IS PRESENT AT “PSW” AT DSI CONTROL.
MAIN BURNER LIGHTS NO YES • CHECK FOR STRONG SPARK AT IGNITER........ • • • • SPARK STOPS WHEN BURNER LIGHTS NO • (SEE PREVIOUS PAGE). CHECK FOR 24 VAC ACROSS GAS VALVE. CHECK OUTPUT VOLTAGE FROM CONTROL TERMINALS TO GAS VALVE.....IF NO VOLTAGE REPLACE CONTROL. CHECK ELECTRICAL WIRING, AND VOLTAGE BETWEEN IGNITION CONTROL AND GAS VALVE. IF OK, REPLACE GAS VALVE.
29. START-UP / COMMISSIONING SHEET THIS EQUIPMENT HAS BEEN FACTORY FIRED AND TESTED PRIOR TO SHIPMENT. HOWEVER, THIS APPLIANCE IS NOT “PLUG & PLAY”. IT REQUIRES COMMISSIONING AND FIELD ADJUSTMENT / SPECIFICATIONS CONFIRMATION TO ENSURE SAFE AND EFFICIENT OPERATION. COMMISSIONING REPORT AS PER I&O MANUAL AND LOCAL CODES CONTRACTOR NAME: ................................................................................DATE................................ ADDRESS:...............................................
QUALIFIED INSTALLER TO COMPLETE THIS TO BE COMPLETED BY THE LICENSED INSTALLER TUBE HEATERREPORT COMMISSIONING REPORT TUBE HEATER COMMISSIONING TYPE OF GAS: NG LP DOES BUILDING HAVE A NEGATIVE CONDITION: YES NO IF THIS IS A HIGH ALTITUDE AREA WHAT IS THE ALTITUDE ABOVE SEA LEVEL Feet DOES APPLICATION REQUIRE FRESH AIR TO BURNER YES NO IS HEATER EXPOSED TO CHEMICAL OR CORROSIVE ATMOSPHERE: YES NO ARE ACTUAL MINIMUM CLEARANCES AS PER TABLE 3 YES NO CAN HEATER BE AFFECTED BY OVERHEAD CRANES /
30. DIMENSIONS AND WEIGHT Assembled System: • Weight: 96 pounds (44 kg) • Dimensions: 119.5” L x 20” W x 12” H (3035 mm x 508 mm x 305 mm) Burner: • Weight: 26 pounds (11.8 kg) • Dimensions: 16” L x 10.25” W x 10.75” H ( 406 mm x 260 mm x 273 mm) Tube Reflector System: • Weight: 60 pounds (27 kg) • Dimensions: 103.5” L x 16.5” W x 7.
31. HIGH ALTITUDE INSTALLATION When this appliance is installed above the altitude stipulated below, the input must be de-rated by 4% for each 1000 ft . If your local utility supplies gas with a de-rated heat content, no orifice change is required in the heater . Check with your local utility regarding de-rating. USA: The factory installed orifice for this appliance is approved for altitudes zero to 2000 feet above sea level. Above 2000 feet, refer to table below.
32.
903000041 PROTECTIVE GUARD SCREEN OPTION – Recommended for heater mounted with less than 8 feet [2.4 m] between floor and bottom of heater Two sections make up the protective guard assembly that installs on the underside of the heater. Near the bottom edge at each side of the reflector are two sets of three holes. Each set of holes has one round hole at the center of the reflector, the other two holes are elongated and positioned between the center and the ends of the reflector.
Fig.5 Fig. 6 STEP 4: On the second side of the reflector, first Insert a guard pin into the center hole, Fig 5. Insert remaining guard pins in the reflector holes, Fig 6. Step 5: Repeat the process with the second guard section. Hold guard screen firmly to bend pins Fig. 7 Fig. 8 Step 6: Re-install the screws at the bottom edge of the reflector into the three hangers, Fig. 7. Fig. 9 Fig. 10 (Center) Fig.
33.
# 22 PART DESCRIPTION PART # PART DESCRIPTION PRIMARY WIRING KIT (not shown) 905000024 Low Voltage Wiring Kit w/ Harness INDICATOR LAMPS 905000025 Indicator light amber 905000026 Indicator light green 905000027 Indicator light red Cord - electrical 6' 23 ELECTRICAL CORD 905000028 24 IGNITION SPARK CABLE See Above 25 IGNITER KIT 906000082 Spark Igniter & Gasket Kit 26 SIGHT GLASS ASSEMBLY 909000118 Sight glass assembly - tube heater 27 FLANGE WASHER PLATE 909000119 Washer plat
HE SERIES TUBE / REFLECTOR SYSTEM 25 IGNITER KIT 906000082 Spark Igniter & Gasket Kit 26 SIGHT GLASS ASSEMBLY 909000118 Sight glass assembly - tube heater 27 FLANGE WASHER PLATE 909000119 Washer plate - Bottom 2 Burner studs 28 TUBE FASTENING BRACKET 909000120 Positions tube in hanger / reflector system 31 PREFORMED U-TUBE 906000147 Preformed U-Tube: 17 ft tube length 32 HANGER 909000134 System Hanger 33 REFLECTOR 906000131 Reflector 34 REFLECTOR END PLATE 909000133 Reflector
NOTES 53 HE Series Infrared Gas Heater Installation and Operation Manual
NOTES HE Series Infrared Gas Heater Installation and Operation Manual 54
NOTES 55 HE Series Infrared Gas Heater Installation and Operation Manual