Installation manual
Rinnai Australia 21 Energysaver® - Operation & Installation Manual
.
Consult the ‘Energysaver
®
Space Heater Co-Axial Flue Systems Installation Manual’
included with the ‘On Wall’ or ‘Direct’ flue kits for detailed flue installation
instructions. Use only Rinnai Flue components with this appliance.
The following configurations are currently available. For alternative configurations contact Rinnai
Components
DIRECT / EXTENDED
Option A (Direct) Option B (Direct Extended)
Direct Flue Kit ESDFK Direct Flue Kit
Co-Ax Pipe 900mm
(Optional) #
ESDFK
ESPIPE900
SIDEWAYS Components
Direct Flue Kit
Co-Ax Pipe 900mm #
Back Cover Set
(see note below)
ESDFK
ESPIPE900
EXTERNAL WALL Components
Option A (Vertical Termination) Option B (On Wall Termination)
Direct Flue Kit
Co-Ax Pipe 900mm #
Bend (2 x 45º)
Condensate Trap
Roof Cowl
ESDFK
ESPIPE900
ESBEND
ESCONDK
ESROOFCOWL
Direct Flue Kit
Co-Ax Pipe 900mm #
Bend (2 x 45º)
Condensate Trap
ESDFK
ESPIPE900
ESBEND
ESCONDK
IN-WALL Components
Option A (Direct) Option B (Offset)
Vertical Adaptor Kit §
Co-Ax Pipe 900mm #
Roof Cowl
ESFKITIW
ESPIPE900
ESROOFCOWL
Vertical Adaptor Kit §
Co-Ax Pipe 900mm #
Bend (2 x 45º)
Roof Cowl
ESFKITIW
ESPIPE900
ESBEND
ESROOFCOWL
UNDER FLOOR Components
Direct Flue Kit
Co-Ax Pipe 900mm #
Bend (2 x 45º)
Back Cover Set
(see note below)
ESDFK
ESPIPE900
ESBEND
# Order lengths as required § Includes Condensate Trap (ESCONDK)
The Energysaver Heater comes supplied with a standard back cover set. For
‘Sideways’ & ‘Underfloor’ installations, refer to the ‘Energysaver Space Heater Co-
Axial Flue System Installation Manual’ for the alternative back cover set required.
Flue is NOT to be terminated under the floor or in a roof space.
‘Down & Out’ and vertical ‘through roof’ flue installations are permitted ONLY when
the flue terminal is located externally.
For horizontal installations there must be a continuous fall of at least 2° to the
termination point to drain condensate.
All terminations exceeding a vertical height of 1.5 metres must incorporate a
condensate trap.
‘Down & Out’ Flue systems must have a continuous fall of at least 2° to the
termination point to drain condensate. Flue terminal must be at least 300 mm above
the ground in accordance with AS 5601, Clause 5.13.6.2 and Fig. 5.3.
NOTE
NOTE
DO NOT
WARNING
FLUE INSTALLATION CONFIGURATIONS