Installation Guide
Polypropylene (PP) Common Venting Installation Instructions            33 
Copyright © 2018 Rinnai America Corporation. All Rights Reserved.  
A6 General Assembly Instructions 
Correct Pitch 
The pipes and formed parts must be installed at an angle of 3° incline towards 
the heating appliance, to allow the condensate to dispose in accordance with 
regulations. 
Note: 3° Pitch equals a height difference of 2” per 3 ft (5.6 cm/meter) 
Lubricant 
•  The seals and male ends of all common vent components must be 
lubricated before assembly. Use ONLY CENTROCERIN© lubricant or 
water to aid in the assembly of these vent components. 
•  Apply a thin layer of CENTROCERIN© lubricant to each seal before 
assembly. 
•  A tube CENTROCERIN© lubricant is packed with every kit assembly and 
available for separate purchase. 
•  1 tube of CENTROCERIN© lubricant is sufficient for a 100ft common 
header installation 
Flow Direction 
•  The female end of the components in contact with the flue gasses must 
always point in the direction of the termination.  
•  It is imperative to maintain this flow direction for proper condensate flow 
and integrity of the seal/gasket. 
Seal Direction and Assembly of Seals 
Seals are pre-assembled in the vent components. If a seal is missing or 
damaged, this component should not be used or an appropriate seal must be 
installed. 
•   Use ONLY original seals. NEVER use fabricated or non common vent 
seals. 
•  Use only the appropriate nominal width and diameter seals. 
•  Confirm seal is installed in the appropriate direct (see figure) 
•  Seal and Seal Chamfer must remain clean and free of foreign debris  
before assembly. 
Joining, Disconnecting, Shortening and Chamfering 
For measuring purposes the seals can be removed from their chamber.  
Note: always reassemble the seals in the right direction, as indicated in the illustration. 
•  Lubricate the seals and/or male ends of the components with CENTRO-
CERIN©  lubricant or water and assemble the components using light 
rotational movements. Entirely insert the male end into the female end. 
•  Inspect immediately the correct position of the seal as the system is 
produced out of translucent material 
•  Pipes are always shortened on the male end. Never cut or modify formed 
vent components such as elbows or collectors. 
•  Cut straight ,perpendicular to the tube and chamfer the edges 
approximately 15° at 1/4”. 
3 ft ( ) 
2”  
( )
1/4 “ ( ) 










