Installation Guide
Polypropylene (PP) Common Venting Installation Instructions            27 
Copyright © 2018 Rinnai America Corporation. All Rights Reserved.  
Installaon Instrucons 
Back to back Conguraon (2 to 8 water heaters) 
In Line Conguraon (2 to 8 water heaters) 
Follow these Rinnai instrucons, the Rinnai Installaon and operaon Manual and the Ubbink Vent System 
Assembly instrucons located in the appendix of this manual. 
Install the venng according to one of the 2 conguraons below. Do not locate the common vent header 
remotely from the water heaters. (Room air conguraons follow the same instrucons excluding 
informaon regarding air intake.) 
The installaon area should be measured to make sure that adequate space is available to install the water 
heaters and venng system.  
NOTE: Dimensions above 
are used in all back to back 
configurations 
Note: If water heaters are mounted directly on a wall, air intake piping will need to be in front of the  
appliance adapters. Installer is responsible for installing appropriate support for the vent system.  
20.5” (520mm) 
TYPICAL 
20.5” (520mm) 
TYPICAL 
3° 
1”  
(25mm) 
2”  
(51mm) 
3”  
(76mm) 
AIR 
INTAKE 
7” 
 (187mm)  
6.25”  
(159mm)  
3° 
1”  
(25mm) 
2”  
(51mm) 
3”  
(76mm) 
AIR 
INTAKE 
4”  
(101mm) 
5”  
(127mm) 
6”  
(152mm) 
7”  
(178mm) 










