Installation Guide
Polypropylene (PP) Common Venting Installation Instructions            18 
Copyright © 2018 Rinnai America Corporation. All Rights Reserved.  
There should be a minimum of 36” between exhaust and intake terminaons. 
Clearances of Brackets:    
All supports such as wall brackets or spacer blocks must be installed with a maximum distance of 78 in (2 m) 
between each support. Addional supports can be installed before and aer an elbow if needed. 
Freestanding Components:   
Components which are installed freestanding for vercal terminaon with a length of over 59 in (1.5 m), must 
be addionally secured to the building with guys or braces. 
Vercal Terminaon Clearances (All System Sizes)  
Vent terminaon per ANSI Z223.1/NFPA 54. For clearances not specied in ANSI Z223.1/NFPA 54, clearances 
are in accordance with local installaon codes and the requirements of the gas supplier. 
12” MINIMUM INSIDE 
EDGE TO INSIDE EDGE 
12” OVER MAX. 
SNOW LEVEL OR 
24” WHICHEVER 
IS GREATER 
INTAKE 
EXHAUST 
Water Heater Clearances 
Maintenance Clearances 
If the vent system is to be enclosed, it is suggested that the design of the enclosure shall permit inspecon of 
the vent system. The design of such enclosure shall be deemed acceptable by the installer or the local 
inspector. 
Refer to the water heater installaon and operaon manual for minimum clearance requirements around the 
water heater. 










