Installation Guide

Polypropylene (PP) Common Venting Installation Instructions 18
Copyright © 2018 Rinnai America Corporation. All Rights Reserved.
There should be a minimum of 36” between exhaust and intake terminaons.
Clearances of Brackets:
All supports such as wall brackets or spacer blocks must be installed with a maximum distance of 78 in (2 m)
between each support. Addional supports can be installed before and aer an elbow if needed.
Freestanding Components:
Components which are installed freestanding for vercal terminaon with a length of over 59 in (1.5 m), must
be addionally secured to the building with guys or braces.
Vercal Terminaon Clearances (All System Sizes)
Vent terminaon per ANSI Z223.1/NFPA 54. For clearances not specied in ANSI Z223.1/NFPA 54, clearances
are in accordance with local installaon codes and the requirements of the gas supplier.
12” MINIMUM INSIDE
EDGE TO INSIDE EDGE
12” OVER MAX.
SNOW LEVEL OR
24” WHICHEVER
IS GREATER
INTAKE
EXHAUST
Water Heater Clearances
Maintenance Clearances
If the vent system is to be enclosed, it is suggested that the design of the enclosure shall permit inspecon of
the vent system. The design of such enclosure shall be deemed acceptable by the installer or the local
inspector.
Refer to the water heater installaon and operaon manual for minimum clearance requirements around the
water heater.