Installation Sheet

10 Fan Convector Manual
13. Adjust the Low re seng by using the “UP”(to
increase) and the “DOWN” (to decrease)
buons to adjust the manifold pressures per the
table below.
14. Press the Test switch (FIGURE 2) again to place
the unit in High re mode. “PH” will appear on
the display.
15. Adjust the High re seng by using the “UP”(to
increase) and the “DOWN” (to decrease)
buons to adjust the manifold pressures per the
table below.
16. Press the “ON/OFF” buon to cease operaon.
(The unit will not revert to its normal state unless
the “ON/OFF” buon is pressed.)
17. Press the “ON/OFF” buon once again to
complete procedure.
18. Turn o gas supply. Remove manometer and
reinstall test port plug. (FIGURE 3)
19. Turn on gas supply. Operate the unit normally
checking for normal operaon and gas leaks.
20. Turn o gas and power supply to unit.
21. Reinstall front panel. (FIGURE 1)
22. Turn on gas and power supply and place unit in
normal working condion.
Low pressure
2,001-5,200
NG LPG
FC510 0.75” W.C. 1.31” W.C.
FC824 0.61” W.C. 1.17” W.C.
High pressure
2,001-5,200
NG LPG
FC510 1.8” W.C. 3.2” W.C.
FC824 3.4” W.C. 6.3” W.C.
Failure to properly follow these instrucons may result in the unit shung down.
ATTENTION
WARNING
Failure to correctly reassemble the components according to these instrucons may
result in a gas leak or explosion.
FIGURE 3
High Altude Installaons