Installation Sheet
Installation & Servicing Instructions Rinnai E-Series
7
1.7 Relevant Installation, Service and User manuals
– Approved vent system
– User manual
1.8 Disposal
– Dispose of the boiler packaging in an environmentally sound manner.
– Dispose of components of the heating system (e.g. boiler or control device), that
must be replaced in an environmentally responsible manner.
2 Regulations and guidelines
The installation must comply with the requirements of the authority having jurisdiction
or, in the absence of such requirements, with the latest edition of the National Fuel
Gas Code, ANSI Z223.1/NFPA 54.
Where required by the authority having jurisdiction, the installation must comply with
the Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/
ASME CSD-1.
Install CO detectors per local regulations. Boiler requires an inspection every 2 years
and maintenance every 4 years or 8000 hours. See maintenance section chapter 13.
Operating Limits of the boiler:
Max. boiler set point temperature: 176 °F (80.0 °C)
Max. operating pressure: 45 psi (3 bar)
Max. Allowable Working Temperature ASME: 200 °F (93 °C)
Max. Allowable Working Pressure ASME: 45 psi (3 bar)
FOR INSTALLATIONS IN THE COMMONWEALTH OF MASSACHUSETTS
NOTICE BEFORE INSTALLATION This direct-vent appliance must be installed by
a licensed professional. If you are not properly trained, you must not install this unit.
IMPORTANT: In the State of Massachusetts (248 CMR 4.00 & 5.00)
For all side wall horizontally vented gas fueled equipment installed in every dwelling,
building or structure used in whole or in part for residential purposes, including those
owned or operated by the Commonwealth and where the side wall exhaust vent
terminationislessthanseven(7)feetabovenishedgradeintheareaoftheventing,
including but not limited to decks and porches, the following requirements shall be
satised:
1. INSTALLATION OF CARBON MONOXIDE DETECTORS. At the time of installation
of the side wall horizontal vented gas fueled equipment, the installing plumber or
gasttershallobservethatahardwiredcarbonmonoxidedetectorwithanalarm
andbatteryback-upisinstalledontheoorlevelwherethegasequipmentisto
beinstalled.Inaddition,the installing plumberorgasttershallobserve thata
battery operated or hard wired carbon monoxide detector with an alarm is installed
on each additional level of the dwelling, building or structure served by the side
wall horizontal vented gas fueled equipment. It shall be the responsibility of the
propertyownertosecuretheservicesofqualiedlicensedprofessionalsforthe
installation of hard wired carbon monoxide detectors.
NOTICE
i