Installation Sheet
Installation & Servicing Instructions Rinnai E-Series
61
14 Maintenance
Maintenance or changes to the boiler may only be carried out by a licensed
professional.
To protect yourself from harm, before performing maintenance:
- Turnotheelectricalpowersupplybyswitchingotheboileratthemainspower
switchorbyturningotheelectricityatthecircuitbreaker.
- Turnothegasatthemanualgasvalve,usuallylocatedbelowtheboiler.
- Turnotheincomingwatersupply.Thiscanbedoneattheisolationvalveusually
locatedbelowtheboilerorbyturningothewatersupplytothebuilding.
14.1 Periodic examination of venting systems and boiler
The inspection of the boiler and venting system should be done every 2 years or
4000 hours and full maintenance every 4 years or 8000 hours of operation, whichever
occursrst.Whendoingthisthecircumstancesoftheboiler’slocationmustbetaken
into account. From this one can determine whether to deviate from this advice.
Please contact Rinnai for further guidance on the frequency and service
requirements. Contact details can be found on the back page of this manual.
14.2 Inspection
Preparing the boiler for inspection
To carry out the maintenance activities please follow the next procedure:
- Switchothepowersupply;
- Shutothegas;
- Valveotheboilerfromthesystemusingtheboilerisolationvalvesintheplumbing
kit.
-
Removethe4screwsA,B,CandDinthequickreleasesofthecasing(gure31);
- RemovethescrewEbehindthedooronthefrontofthecasing(gure31);
- Remove it towards the front.
- Clean the casing with a cloth with a simple (non-abrasive) cleaning agent;
NOTICE
i
NOTICE
i
Removing casing
gure 31










