Installation Sheet

Installation & Servicing Instructions Rinnai E-Series
18
manufacturer.
11. If the installation is a zone system be sure to purge out each zone individually
12. Close the auto feed on the system (F1)
13. Close the return side purge station (BD2) and disconnect the hose (H3).
14. Open the main valve on the system return (V3)
15. Close the bypass valve below the boiler (V4).
16.Openshuto󰀨valvesonboththesupplyandreturnconnectionsbelowtheboiler
(V1 and V2).
17. Clean out the dirt trap
18.TestthepHofthewaterthatwillbeusedforllingthesystem
19.Testthewaterhardnessofthewaterthatwillbeusedforllingthesystem
20. Use the proper water treatment to ensure the pH and water hardness are within
the Rinnai boiler water quality guidelines
21.Theboilerandsystemmaynowbelled.
The following is a list of approved system cleaners, inhibitors, and antifreeze.
Approved antifreeze:
• Rhomar RhoGard Mutli-Metal (AL safe) • Sentinel X500
• Noble Noburst AL • Fernox Alphi 11
Approved system cleaner:
• Noble Noburst Hydronic System Cleaner • Fernox F3 Cleaner
• Rhomar Hydro-Solv 9100 • Sentinel X400
The system cleaners from NoBurst, Rhomar, and Fernox are NOT to be used in
the boiler. The boiler must be closed o󰀨 (valved o󰀨) from the rest of the system
or not connected while the cleaners are in the system. The system should then
be drained and then thoroughly ushed with clean water to remove all the
system cleaner.
Approved inhibitors:
• Rhomar Pro-tek 922 • Sentinel X100
• Noble Noburst AL inhibitor
- Connect the expansion tank to the system. See chapter 6.2.
- Connect the pipes so that they are free from strain.
The boiler has a self-adjusting and self-protecting control system for the load and the
pumpcapacity.Bythismeans,thetemperaturedi󰀨erencebetweenthesupplyandreturn
water is checked and controlled.
If the installation resistance is over the stated value; the load will be adjusted until
anacceptable temperaturedi󰀨erence between supply and returnwater hasbeen
obtained.If,afterthis,thetemperaturedi󰀨erenceisstillnotacceptablethentheboiler
willswitcho󰀨andwaituntilanacceptabletemperaturehasarisen.
If an unacceptable temperature is detected, the control will repeatedly try to achieve
waterowovertheboiler.Ifnottheboilerwillswitcho󰀨.
Asstandardtheboilerisprovidedwithawaterlterinthereturnpipeoftheboiler,
sothatdebrisfromthecentralheatingwaterispreventedfroma󰀨ectingtheboiler.
NOTICE
i
Water lter gure 8