Installation Sheet

Installation & Servicing Instructions Rinnai E-Series
65
Visual inspection of the ame (2 and 4 year maintenance)
Theburnermustameevenlyovertheentiresurfacewhenoperatingcorrectly.The
amemustburnwithaclear,blue,stableame.
Checktheamethroughtheinspectionglassintheignitionprobe(g.38).
Theamepatternshouldbeasshownintheguresbelow.
Further checks:
- Inspect the pressure relief valve
- Cleanthewaterlterinthereturnpipe
- Check the pH of the water or glycol/water mixture.
The combustion must be checked and adjusted if required at both the 2
year/4000 hour and 4 year/8000 hour service intervals with a properly working
combustion analyzer.
Verify proper operation after servicing. Always reset the service interval counter after
full maintenance interval (every 4 years or 8000 hours of operation).
14.3.1 Reset service interval counter
At8000hoursofuse,“SERVICE”willscrollacrossthedisplay.“Good”willdisplay
as well alternatively.
Toresetthe8000hourservicenotication:
- Enter the 1st Tier Settings: 123 Code
- Brieypress“Mode”againuntiltheServiceChapterisdisplayed(SERV)
- Holdthe“Store”buttonuntilSERVashesonce—theservicenoticationwillno
longer show during normal operation and the countdown to service will reset to
8000.
14.4 Limited warranty
For warranty conditions refer to the warranty supplied with the boiler.
Inspectionglass gure39
NOTICE
i
Waterlter gure40
SATISFACTORY
Ignition probe
blueame
UNSATISFACTORY
Ignition probe
yellowame