User`s guide

6 To Make Measurements RIGOL
DS2000 User’s Guide
6-17
Delay and Phase
Source A
Source B
Period
Delay
Source A and source B can be CH1 or CH2.
1. Delay AB : the time difference between the rising edges of source A and
source B. Negative delay indicates that the selected rising edge of source A
occurred after the selected edge of source B.
2. Delay AB : the time difference between the falling edges of source A and
source B. Negative delay indicates that the selected edge of source A occurred
after the selected edge of source B.
3. Phase AB : phase difference calculated according to “Delay AB ” and the
period of source A, expressed in degree.
4. Phase AB : phase difference calculated according to “Delay AB ” and the
period of source A, expressed in degree.
°360×
ASource of Period The
Delay
=Phase