Use and Care Manual

Assembly procedure - eaves -
soil profi le
(pos. 2.1) slide
to co
rner bracket
corner bracket (V12) screwed with
self-tapping screw pan head
4,2 x 13 (S9).
Slide the side glazing in the soil pro-
fi i le and rand rung and threading.
tip:
please solve the foil only at the
margin!
to step 9:
to step 8:
Now you need several hands or
corresponding aids.
Gable upright, hold and secure
support.
The ridge profi le (pos. 3.3) now
introduce into the existing grooves/
slots of the gable, so that the
profi les is fl ush with the front.
Now screw the end plate (V11) with
self-tapping screw pan head 4,2 x
13 (S9).
to step 10:
step 8
step 9
step 10
ATTENTION! When using a foundation frame assemble in advance on this soil profi le (see page 5, 6)
ridge profi le (pos. 3.3) at the gable and
end plate (V11) screw with self-tapping
screw pan head 4,2 x 13 (S9)
ridge profi
l (pos. 3.3)
ends support or
hold up it
insert the side glazing and
thread
First, the lateral soil profi les on the
corner bracket on the gable attach.
22