Use and Care Manual
Riga S Riga
730 x 728 1048 x 728
ATTENTION! When using a foundation frame assemble in advance on this soil profi le (see page S. 5, 6)
soil profi le (pos.1.1)
door frame right (pos.1.7)
door frame left (pos.1.6)
corner soil profi le (V9)
step 1
glazing
glazing
self-tapping screw pan head 4,2 x 13 (S9)
Note: Only after the screw mounting of the door -->
ability to align.
crossbar (pos.1.9)
crossbar (pos.1.9)
view from inside
self-tapping screw pan head 4,2 x 13 (S9)
connecting plate (V5)
screw M6 x 16 (S5)
with nut M6 (S1)
glazing
door frame
above
(pos.1.8)
glazing
to step 1:
First, please slide the door frame
left (pos.1.6) and the door frame
(pos.1.7)
(profi le with 8 drill holes, a 30° chamfer and
a black plastic glide)
up to the small holes in the middle
of the soil profi le. The chamfer must
show this to the outside. Then at-
tach the corner bracket (V9) on the
soil profi le.
step 2
Assembly procedure gable
to step 2:
Even now you need the small side
windows.
Dimensions are listed in the table.
With bar direction - vertical - in the
soil profi le and sideways while in the
door frame.
step 3
to step 3:
Now the crossbar (pos. 1.9) is inser-
ted from the top of the glazing.
step 4 to step 4:
Before the connecting plate (V5)
with the door frame above (pos.1.8)
screwed, slide in the vertical door
frames (pos.1.6/1.7) two hex screws
M6 x 16 (S5) and in the horizontal
door frame in M6 x 16 (S5) one.
view from inside
10