Use and Care Manual
1 window opener
2 pressure cylinder
3 cotter pin
4 mounting plate window profi le
5 mounting plate crossbar
Parts window opener
If the greenhouse is not "frost-free" hold, we recommend you to remove the entire window ope-
ner or only the pressure cylinder. Please keep the window opener in a dry or frost-free place.
Before reassembly in the spring especially the cylinder rod and the cylinder threads are grea-
sed to check if it is. The cylinder rod check for ease of movement, please.
The window opener needed after the assembly about 3 - 4 hours to adjust the temperature in
the greenhouse. The more you screw the pressure cylinder into the threaded device, the ear-
lier and more highly opens the window. Do you want earlier/higher opening, turn the pressure
cylinder clockwise. In a later/lower opening counter-clockwise, with one turn is about 0,5°C.
Please keep in mind that can vary the temperature in your greenhouse and several window
openers have small tolerances.
Assembly instructions:
User guide - window opener -
1. Check whether the greenhouse window can open and close freely and unhinderedly.
Please remove from other manufacturers in advance the existing hand openers.
2. First install the window opener with the mounting plate (4) to the roof window profi le (pos. 4.2).
3. Choose from the mounting plate (5) the middle hole and attach it to the cross rung (pos.3.2)
below the roof window.
4. The pressure cylinder at the upper end of threaded device secure with the cotter pin in the
t-coupling (upper hole).
Ajustment:
Winter-storage:
15
1
2
3
4
5