Installation Guide
11
glazing
Edge curve right - (pos.1.5.6)
Edge curve left - (pos.1.5.4)
Edge curve connects to the soil profile corner (V9)
The rear gable is assembled in the same way!!!
glazing
Only rear gable!
cross bar 
(Pos.1.8)
step 5 to step 5:
The square peg in the soil profile 
corner (V9) is plugged into the bottom 
of the Edge curve (pos.1.5.4/1.5.6).
The small triangular glazing is 
positioned in the door frame top (pos 
1.8)
The Edge curve (pos.1.5.4/1.5.6) is 
attached to the door frame using the 
connecting plate (V5), installed in step 
4, and 2 self-tapping screws pan head 
4,2 x 13 (S9). 
All fasteners should be hand tight.
- See also step 4! -
step 6:
to step 6:
The cross bars (pos.1.9) are 
mounted horizontally with the 
self-tapping pan head screw 4,8 
x 45 (S13).
step 7:
view from outside
to step 7:
Slide the upright profiles (pos 1.6/1.7) into 
the soil profile.
Insert the (787 x 728 mm) glazing between 
the upright profiles (pos 1.6/1.7)
Insert one M6 x 16 (S5) into each upright 
profile (pos 1.6/1.7)
Insert four M6 x 16 (S5) into the cross bar 
(pos 1.8)
Insert one M6 x 16 (S5) into each cross 
bar (pos 1.9)
Connect the upright profiles (pos 1.6/1.7) 
to the cross bars (1.8/1.9) with connecting 
plates (V10)
Attach the edge curve left/right 
(pos.1.5.4/1.5.6) to the cross bars (1.9) 
with the self-tapping pan head screw 4,8 x 
45 (S13).
view from outside
1x
M6x16
4x
M6x16
1x
M6x16
connecting
plate (V10)
Assembly procedure gable
ATTENTION! When using a foundation frame attach it to soil profile in advance (see pages 5, 6)










