Installation Guide
Riga S Riga
730 x 728 1048 x 728
10
Assembly procedure gable
ATTENTION! When using a foundation frame attach it to soil profile in advance (see pages 5, 6)
soil profile (pos.1.1
door frame right (pos.1.7)
door frame left (pos.1.6)
soil profile corner (V9)
step 1
glazing
glazing
self-tapping screw pan head 4,2 x 13 (S9) 
Note: Only attach after the door is mounted and 
aligned
cross bar (pos.1.9)
cross bar (pos.1.9)
view from inside
self-tapping screw pan head 4,2 x 13 (S9)
connecting plate (V5)
screw M6 x 16 (S5) 
with nut M6 (S1)
glazing
door frame 
top
(pos.1.8)
glazing
to step 1:
Items needed:
Pos 1.6 (Door frame left)
Pos 1.7 (Door frame right with 8 holes) 
Pos 1.1 (Soil Profile)
Soil Profile Corner (V9)
Slide pos 1.6 and pos 1.7 up to the 
small holes in the middle of pos 1.1(soil 
profile). The chamfered edge must be 
facing to the outside. Then attach the 
soil profile corner (V9) to the ends of the 
soil profile. 
step 2 to step 2:
Now you need the small side glazing. 
Slide the side glazing into the door 
frames and soil profile.
The dimensions are listed in the 
diagram. 
Note: After the door is mounted and 
aligned attach pos 1.6 and pos 1.7 with 
pan head screw 4,2 x 13 (S9). 
step 3
to step 3:
Now insert the cross bar (pos. 
1.9) onto the top of the glazing.
step 4
to step 4:
Items needed:
Two Connecting Plates (V5) 
Pos 1.8 (Cross Bar-door frame top) 
Four Hex Screws M6 x 16 (S5)
Slide one hex screw M6 x 16 (S5) into 
the vertical door frames(pos1.6/1.7) 
and two in the crossbar(pos 1.8) 
Attach the crossbar to the door frames 
with the connecting plate (V5). 
Insert the curved glazing into the door 
frames and cross bar (pos 1.9)
view from inside










