Service manual
INSTALLATION FLOW CHART 30 July, 2001
1-4
1.3 INSTALLATION FLOW CHART
The following flow chart shows how to install the optional units more efficiently.
Two-tray Finisher: Needs the duplex unit, HDD or at least 128 MB of memory,
and a paper tray unit or LCT.
Punch Unit: Needs the finisher.
IEEE1394 Board: Needs the memory DIMM.
Unpack the printer.
Will the paper feed unit or LCT be installed?
Place the printer on the paper feed unit or LCT.
Install the paper feed unit or LCT.
Install the controller options (if required).
Yes No
Will the duplex unit be installed?
Install the duplex unit.
Install the four-bin mailbox
(if required).
Install the two-tray finisher.
Install the printer.
Yes No
NoYes
Install the punch unit
(if required).
Will the Two-tray finisher be installed?
G060I002.WMF