Unit installation

Product Support Guide
D009 D011 D012 D013
Ver.1.5 Page 9 of 37 4/8/2008
Subject to change without notice
Installation
Installation Requirements
Temperature Range:
10° C to 32° C (50° F to 89.6° F)
Humidity Range: 15% to 80% RH
Ambient Illumination: Less than 1,500 lux (do not expose to direct sunlight)
Ventilation: Room air should turn at least 30 m3/hr/person
Ambient Dust: Less than 0.10 mg/m3 (2.7 x 10/6 oz/yd3)
Avoid areas exposed to sudden temperature changes:
Areas directly exposed to cool air from an air conditioner.
Areas directly exposed to heat from a heater.
Do not place machine where it will be exposed to corrosive gas or vapor.
Do not install the machine at any location over 2,000m (6,500 ft.) above sea level.
Place the machine on a strong and level base. Inclination on any side should be no more than 5mm (0.2”)
Do not place the machine where it may be subject to strong vibrations.
Machine level
Front to back: within 5mm (0.2”) of level
Right to left: within 5mm (0.2”) of level
Power Requirements
Input voltage level: 110 - 120 V, 60Hz:12.5A
Do not place anything on power cord.
The required wall outlet is a NEMA 5-15R (receptacle)
Space
Foot Print
A (Front) 75 cm (29.6")
B (Left) 10 cm (4")
C (Rear) 10 cm (4")
D (Right) 55 cm (21.7")
The recommended 75cm (29.6”) front space is sufficient to
allow the paper tray to be pulled out. Additional the front
space is required to allow operators to stand at the front of
the machine.
Dimensions (W x D x H): 670 mm x 677 mm x 910 mm (26.3" x 26.8" x 36.1")
Measurement Conditions: With bypass feed table closed, optional PTU and with ARDF.
With optional LCT 1200 - add 348 mm (13.7') to the width.