Specifications
CRP-C0239-01
24
3. Conduct of Certification
The following certification was conducted based on each materials submitted by
evaluation facility during evaluation process.
1. Contents pointed out in the Observation Report shall be adequate.
2. Contents pointed out in the Observation Report shall properly be reflected.
3. Evidential materials submitted were sampled, its contents were examined, and
related work units shall be evaluated as presented in the Evaluation Technical
Report.
4. Rationale of evaluation verdict by the evaluator presented in the Evaluation
Technical Report shall be adequate.
5. The Evaluator's evaluation methodology presented in the Evaluation Technical
Report shall conform to the CEM.
Concerns found in certification process were prepared as certification reviews, which
were sent to evaluation facility.
The Certification Body confirmed such concerns pointed out in Observation Reports
and certification reviews were solved in the ST and the Evaluation Technical Report.