Specifications

CRP-C0239-01
18
2. Conduct and Results of Evaluation by Evaluation Facility
2.1 Evaluation Methods
Evaluation was conducted by using the evaluation methods prescribed in CEM in
accordance with the assurance requirements in CC Part 3. Details for evaluation
activities are report in the Evaluation Technical Report. It described the description of
overview of the TOE, and the contents and verdict evaluated by each work unit
prescribed in CEM.
2.2 Overview of Evaluation Conducted
The history of evaluation conducted was present in the Evaluation Technical Report as
follows.
Evaluation has started on 2008-03 and concluded by completion the Evaluation
Technical Report dated 2009-10. The evaluation facility received a full set of
evaluation deliverables necessary for evaluation provided by developer, and examined
the evidences in relation to a series of evaluation conducted. Additionally, the
evaluation facility directly visited the development and manufacturing sites on
2008-10, 2008-12, 2009-01, 2009-06 and 2009-10 and examined procedural status
conducted in relation to each work unit for configuration management, delivery and
operation and lifecycle by investigating records and staff hearing. Further, the
evaluation facility executed sampling check of conducted testing by developer and
evaluator testing by using developer testing environment at developer site on 2009-06
and 2009-07.
Concerns found in evaluation activities for each work unit were all issued as
Observation Report and were reported to developer. These concerns were reviewed by
developer and all problems were solved eventually.
As for concerns indicated during evaluation process by the Certification Body, the
certification reviews were sent to the evaluation facility. These were reflected to
evaluation after investigation conducted by the evaluation facility and the developer.
2.3 Product Testing
Overview of developer testing evaluated by evaluator and evaluator testing conducted
by evaluator are as follows.
2.3.1 Developer Testing
1) Developer Test Environment
Test configuration performed by the developer is shown in the Figure 2-1.