Specifications

CRP-C0239-01
8
Although the Web Service Function is available for the functions described above in
"1.2.4.1 Copy Function" - "1.2.4.11 Management Function", there are some functions
that are not available using this Web Service Function.
1.3 Conduct of Evaluation
Based on the IT Security Evaluation/Certification Program operated by the
Certification Body, TOE functionality and its assurance requirements are being
evaluated by evaluation facility in accordance with those publicized documents such as
"IT Security Evaluation and Certification Scheme"[2], "IT Security Certification
Procedure"[3] and "Evaluation Facility Approval Procedure"[4].
Scope of the evaluation is as follow.
- Security design of the TOE shall be adequate;
- Security functions of the TOE shall be satisfied with security functional
requirements described in the security design;
- This TOE shall be developed in accordance with the basic security design;
- Above mentioned three items shall be evaluated in accordance with the CC Part 3
and CEM.
More specific, the evaluation facility examined "imagio MP 4000/5000 series, Aficio MP
4000/5000 series Security Target" as the basic design of security functions for the TOE
(hereinafter referred to as "the ST")[1], the evaluation deliverables in relation to
development of the TOE and the development, manufacturing and shipping sites of the
TOE. The evaluation facility evaluated if the TOE is satisfied both Annex B of CC Part
1 (either of [5], [8] or [11]) and Functional Requirements of CC Part 2 (either of [6], [9]
or [12]) and also evaluated if the development, manufacturing and shipping
environments for the TOE is also satisfied with Assurance Requirements of CC Part 3
(either of [7], [10] or [13]) as its rationale. Such evaluation procedure and its result are
presented in "RICOH COMPANY, LTD. imagio MP 4000/5000 series, Aficio MP
4000/5000 series Evaluation Technical Report" (hereinafter referred to as "the
Evaluation Technical Report") [17]. Further, evaluation methodology should comply
with the CEM (either of [14], [15] or [16]).
1.4 Certification
The Certification Body verifies the Evaluation Technical Report and Observation
Report prepared by the evaluation facility and evaluation evidence materials, and
confirmed that the TOE evaluation is conducted in accordance with the prescribed
procedure. Certification review is also prepared for those concerns found in the
certification process. Evaluation is completed with the Evaluation Technical Report
dated 2009-10 submitted by the evaluation facility and those problems pointed out by
the Certification Body are fully resolved and confirmed that the TOE evaluation is
appropriately conducted in accordance with CC and CEM. The Certification Body
prepared this Certification Report based on the Evaluation Technical Report submitted
by the evaluation facility and concluded fully certification activities.
1.5 Overview of Report
1.5.1 PP Conformance
There is no PP to be conformed.