INSTALLATION AND OPERATING MANUAL Series PSG/F, TSG/F 2 and 3 way Sight Glasses Keep for future use! This operating manual must be strictly observed before transport, installation, operation and maintenance Subject to change without notice. Reproduction is generally permitted with indication of the source.
Series PSG/F, TSG/F Page 2 List of Contents List of Contents 2 Relevant documents 2 1 Technical data 3 1.1 Name plate, CE and body markings............ 3 1.2 Tightening torques....................................... 4 1.3 Pressure/temperature diagram ................... 5 2 Notes on safety 5 2.1 Intended use................................................ 6 2.2 For the customer / operator......................... 6 2.3 Improper operation ......................................
Series PSG/F, TSG/F 1 Page 3 Technical data Manufacturer: Installation position: Richter Chemie-Technik GmbH Otto-Schott-Str. 2 D-47906 Kempen Telephone: +49 (0) 2152 146-0 Fax: +49 (0) 2152 146-190 E-Mail: richter-info@idexcorp.com Internet: http://www.richter-ct.com A direction arrow on the body indicates the direction of flow. See Section 6.2. Designation : Flexicord strip as an additional flow Double glass panes see Section 10.4 Seal in the bypass connection see Section 1.
Series PSG/F, TSG/F 1.2 Page 4 Tightening torques All screws greased, tighten in diametrically opposite sequence! The tightening torques for pipe screws and body screws mentioned must not be exceeded. For an exception, see Section 8, Flange connection valve / pipe is leaking. The following tightening torques are recommended. Pipe screws, flanges to ISO/DIN Flange nom.
Series PSG/F, TSG/F 1.3 Pressure/temperature diagram Page 5 According to ASME B 16.42 According to AD 2000 When used in the area of application of ASME, the low temperature of ASTM A395 is limited to -20°F (-29°C). When used in the minus temperature range, the regulations applicable in the country in question must be observed. 2 Notes on safety This operating manual contains fundamental information which is to be observed during installation, operation and maintenance.
Series PSG/F, TSG/F 2.1 Intended use Richter sight glasses of the series PSG/F and TSG/F are pressure-maintaining components in accordance with the Pressure Equipment Directive (PED) for the passage of fluids. They permit a view into the housing interior from two opposite sides. The valves are suitable for vapours, gases and liquids of group 1 in accordance with the PED and have a corrosion-resistant plastic lining.
Series PSG/F, TSG/F Page 7 Static discharges of non-conductive linings are only produced through the interaction with a non-conductive medium and are therefore the responsibility of the plant operator. Static discharges are not sources of ignition which stem from the valves themselves! The temperature of the medium must not exceed the temperature of the corresponding temperature class or the maximum admissible medium temperature as per the operating manual. If the valve is heated (e.g.
Series PSG/F, TSG/F 5.1 Storage If the valve is not installed immediately after delivery, it must be put into proper storage. It should be stored in a dry, vibration-free and wellventilated room at as constant a temperature as possible.. Elastomers are to be protected against UV light. In general, a storage period of 10 years should not be exceeded. 5.
Series PSG/F, TSG/F 7 Operation 7.1 Initial commissioning Normally, the valves have been tested for leaks with air or water. Prior to initial operation check cover screws. For torques see Section 1.2. Unless otherwise agreed, there could be residual amounts of water in the flow section of the ball valve; this could result in a possible reaction with the medium.
Series PSG/F, TSG/F 10 Page 10 Drawing 10.1 Legend 100 106 114 408 902/1 920/1 936/1 body cover pane seal stud. screw hex. nut toothed lock washer Option Flexicord-strip 981/1 Flexicord-strip Option double glass pane 417 U-seal 10.
Series PSG/F, TSG/F Page 11 10.3 Sectional drawing PSG/F Option 10.
Series PSG/F, TSG/F Page 12 10.5 Dimensional drawing PSG/F 25 40 50 65 80 100 150 [mm] [mm] [mm] [mm] [mm] [mm] [mm] L 160 200 230 290 310 350 480 A 85 110 120 Ø175 Ø190 Ø210 Ø250 Øa 48 65 80 80 100 125 137 B1 ca.135 ca.155 ca.185 ca.194 ca.246 ca.294 ca.374 B2* ca.158 ca.182 ca.218 - ca.289 ca.347 - DN * Option: Double glass panes Flange connecting dimensions: DIN EN 1092-2, type B (ISO 7005-2, type B) PN 16 or flanges drilled to ASME B16.
Series PSG/F, TSG/F Page 13 10.6 Dimensional drawing TSG/F 25 50 80 [mm] [mm] [mm] ØD 115 165 200 L 160 230 310 Øa 48 80 100 b 80 115 155 B1 ca.135 ca.185 ca.246 B2* ca.158 ca.218 ca.289 DN * Option: Double glass panes Flange connecting dimensions: DIN EN 1092-2, type B (ISO 7005-2, type B) PN 16 or flanges drilled to ASME B16.5 Class 150.
Konformitätserklärung nach Richtlinie 97/23/EG für Richter Chemie-Technik GmbH Armaturen Declaration of conformity according the directive 97/23/EG for Richter Chemie-Technik GmbH valves Hiermit erklärt die Richter Chemie-Technik GmbH die Konformität der gelieferten Armaturen gemäß der Richtlinie 97/23/EG (Druckgeräterichtlinie). Herewith Richter Chemie-Technik GmbH declares the conformity of the delivered valves according to the directive 97/23/EG (Pressure Equipment Directive).
Safety Information / Declaration of No Objection Concerning the Contamination of Richter-Pumps, -Valves and Components 1 SCOPE AND PURPOSE Each entrepreneur (operator) carries the responsibility for the health and safety of his employees. This extends also to the personnel, who implements repairs with the operator or with the contractor. Enclosed declaration is for the information of the contractor concerning the possible contamination of the pumps, valves and component sent in for repair.
Declaration about the Contamination of Richter Pumps, -Valves and Components The repair and/or maintenance of pumps, valves and components can only be implemented if a completely filled out declaration is available. If this is not the case, delay of the work will occur. If this declaration is not attached to the devices, which have to be repaired, the transmission can be rejected. Every aggregate has to have it’s own declaration.
FAX Fax No. () Pages (incl. cover sheet) () To: () Contact person: () Your order No.: Our Kom. No.: Reference: () () () Extension: - () E-Mail Address: () Date: () Serial No.: () Dear Sirs, The compliance with laws for the industrial safety obligates all commercial enterprises to protect their employees and/or humans and environment against harmful effects while handling dangerous materials.