INSTALLATION AND OPERATING MANUAL Series GU/F Overflow and pressure relief valve DN 25 with certification spring-loaded Keep for future use! This operating manual must be strictly observed before transport, installation, operation and maintenance Subject to change without notice. Reproduction is generally permitted with indication of the source.
Series GU/F Page 2 List of Contents List of Contents ........................................ 2 Relevant documents................................. 2 1 Technical data...................................... 3 1.1 1.2 1.3 1.4 1.5 Name plate CE- and body identification...... 3 Component identification............................. 4 Tightening torques....................................... 4 Screw-in tool for .......................................... 5 Pressure/temperature diagram ...................
Series GU/F 1 Page 3 Technical data Manufacturer: Temperature range: – 60 °C to + 180 °C Richter Chemie-Technik GmbH Otto-Schott-Str. 2 D-47906 Kempen, Germany Telephone: +49 (0) 2152 146-0 Fax: +49 (0) 2152 146-190 E-Mail: richter-info@richter-ct.com Internet: http://www.richter-ct.com See pressure-temperature diagram in Section 1.5 Valve size in mm : DN 25, 40*, 50, 65, 80 in mm 1”, 1½", 2”, 2½" 3” in inches Cl 150 1”, 1½", 2” in inches, Cl 300 on request Weight : Designation: Nom.
Series GU/F Page 4 Body identification: The shell bears the following information accordance with DIN EN 19 and AD 2000, A4: in nominal diameter nominal pressure shell material manufacturer's identification charge number/foundry identification Cast date arrow for direction of flow Pipe screws, flanges to ASME Class 150 or flanges to ISO/DIN, drilled to ASME Class 150 Flange nom.
Series GU/F 1.4 Screw-in tool for Nom. size [mm] [inch] 25 40 50, 65 80 1“ 1½“ 2“ 3“ 1.5 Page 5 According to ASME B 16.42 Article-No. --9568-96-1012 9568-96-1016 9538-96-1002 Pressure/temperature diagram According to AD 2000 * metal seat ** seat/plug PTFE carbon * metal seat ** seat/plug PTFE carbon 2 Safety This operating manual contains fundamental information which is to be observed during installation, operation and maintenance.
Series GU/F 2.1 Intended use Richter overflow valves of the GU series are pressuremaintaining components in accordance with the Pressure Equipment Directive (DGRL) for the passage of fluids at a given test pressure. GU are only intended for vertical installation. The valves are suitable for non-boiling liquids of group 1 in acc. with the Pressure Equipment Directive (DGRL). They have a corrosion-resistant plastic lining.
Series GU/F A difference is made between two cases for the use of -8 chargeable liquids (conductivity <10 S/m): 1. Chargeable liquid and non-conductive lining Charges can occur on the lining surface. As a result, this can produce discharges inside the valve. However, these discharges cannot cause ignitions if the valve is completely filled with medium. If the valve is not completely filled with medium, e.g. during evacuation and filling, the formation of an explosive atmosphere must be prevented, e.g.
Series GU/F 5 Page 8 Transport, storage and disposal It is imperative, for all transport work, to observe generally accepted engineering practice and the accident prevention regulations. The overflow valve is supplied with flange caps. Do not remove them until just before installation. They protect the plastic surfaces against dirt and mechanical damage. Handle the goods being transported with care. During transport the valve must be protected against impacts and collisions.
Series GU/F 5.4 Disposal Parts of the valve may be contaminated with medium which is detrimental to health and the environment and therefore cleaning is not sufficient. Risk of personal injury or damage to the environment due to the medium! 6 Page 9 Wear protective clothing when work is performed on the valve. Prior to the disposal of the valve: Collect any medium, etc. which has escaped and dispose of it in accordance with the local regulations. Neutralise any medium residues in the valve.
Series GU/F Page 10 A draining facility must be provided at the lowest point in the pipe. This opening for the drainage of condensate must be lower than the flow chamber of the body. 6.4 Contamination of or damage to the sealing surfaces is best avoided if the protective caps remain on the flanges until just before installation. We recommend the installation of gaskets so that the sealing surfaces are not damaged by the mating flanges.
Series GU/F 6.6 Page 11 Grounding 6.9 The valve must be grounded. The simplest solution is to use tooth lock washers which are placed under one pipe bolt of each flange. At the customer's request a setscrew M6 with a hex. nut and washer will be provided at each flange as an additional grounding connection. Otherwise grounding must be ensured by different measures e.g. a cable link. 6.7 Installation Signal transmitter (Option) On request, an signal transmitter is available for remote monitoring.
Series GU/F 7 Operation 7.1 Initial commissioning Normally, the valves have been tested for leaks with air or water. Unless otherwise agreed, there could be residual amounts of water in the flow section of the valve; this could result in a possible reaction with the medium. Following the initial loading of the valve with operating pressure and temperature, the torques of all connecting bolts must be checked. See Section 1.3. 7.2 Page 12 7.
Series GU/F 8 Page 13 Malfunctions Overflow valve is leaking Is there foreign matter between the seat and plug? Is there any wear or damage to the seat or plug? Have the nuts at the inlet nozzle been unevenly tightened? Actuation of the lifting lever can help to regain the required sealing effect. If this does not succeed in stopping the leak, the sealing surface of the plug must either be reworked or the plug or seat must be replaced.
Series GU/F 9.3 Modification of the overflow valve If modifications to the valve are required, the manufacturer must always be consulted. Examples: Modification with changed test pressure, replacement of the spring or adaption to the mass flow by reducing the travel. After approval by the manufacturer, these modifications can be performed either by the manufacturer or by the customer under the guidance of a technical supervisory agency or any other approval authority. 9.
Series GU/F Undo the hex. socket screws 914/1. Centre the spring bonnet 513 with internals on the body 100. Ensure that there is metallic contact between the body and the spring bonnet. Then tighten the screws 901/1, 936/1, 936/2 and 920/2. Tighten the hex. socket screws 914/1 for the bellows seal evenly in line with the tightening torques in Section 1.3. Undo stem nut 534. Remove distance sleeve. Screw stem nut 534 onto the stem 802 up to the marking. Then counter with the self-locking hex. nut 929/1.
Series GU/F 10 Page 16 Drawings 10.
Series GU/F 10.
Series GU/F Page 18 10.
Series GU/F Page 19 10.4 Dimensional drawing EN 558 Reihe 1 Nom. size ANSI/ISA-75.08.01 Class 150 d0 H H1 L mm inch mm mm mm mm mm 25 40 50 65 80 1" 1½" 2" --3" 22 32 40 40 50 425 509 535 535 705 120 120 120 120 140 160 200 230 290 310 184 222 254 --298 ANSI/ISA-75.08.01 Class 300 L L inch 7.24 8.70 10.00 --11.73 mm 197 235 267 ----- inch 7.76 9.25 10.
Safety Information / Declaration of No Objection Concerning the Contamination of Richter-Pumps, -Valves and Components 1 SCOPE AND PURPOSE Each entrepreneur (operator) carries the responsibility for the health and safety of his employees. This extends also to the personnel, who implements repairs with the operator or with the contractor. Enclosed declaration is for the information of the contractor concerning the possible contamination of the pumps, valves and component sent in for repair.
Declaration about the Contamination of Richter Pumps, -Valves and Components The repair and/or maintenance of pumps, valves and components can only be implemented if a completely filled out declaration is available. If this is not the case, delay of the work will occur. If this declaration is not attached to the devices, which have to be repaired, the transmission can be rejected. Every aggregate has to have it’s own declaration.
FAX Fax No. () Pages (incl. cover sheet) () To: () Contact person: () Your order No.: Our Kom. No.: Reference: () () () Extension: - () E-Mail Address: () Date: () Serial No.: () Dear Sirs, The compliance with laws for the industrial safety obligates all commercial enterprises to protect their employees and/or humans and environment against harmful effects while handling dangerous materials.