® RoughDeck AX Heavy Capacity Floor Scale System Installation/Operation Manual 107279 Rev B
Contents 1.0 Introduction..................................................................................................................................... 1 1.1 Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.2 Operating Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 2.0 Installation .....................
Rice Lake continually offers web-based video training on a growing selection of product-related topics at no cost. Visit www.ricelake.com/webinars.
1.0 Introduction The RoughDeck® AX heavy capacity floor scale system includes two fully electronic, RoughDeck low profile floor scales, four on/off ramps and two signal trim junction boxes. The RoughDeck scale is available in a size of 32 W x 84 L x 6 H ( 81.3 cm x 213.4 cm x 15.2 cm) and each has a capacity of 30,000 lbs (13,608 kg). Once combined with the ramps, the total length is 204" (518.2 cm).
1.1 Safety Safety Symbol Definitions Indicates an imminently hazardous situation that, if not avoided, will result in death or serious DANGER injury. Indicates a potentially hazardous situation that, if not avoided could result in serious injury or WARNING death, and includes hazards that are exposed when guards are removed. Indicates a potentially hazardous situation that, if not avoided may result in minor or moderate CAUTION injury.
2.0 Installation 2.1 Installation Overview Standard installation of the RoughDeck AX heavy duty floor scale consists of the following steps: 1. Select a site 2. Check levelness and smoothness of site 3. Unpack scales and ramps 4. Adjust the four feet on the scale 5. Anchor ramps and plates that sit above tabs on the scale 6. Connect cable to junction box and indicator 7. Calibrate the unit Access ramp installation is described in Section 2.6 on page 32. 2.
2.4 Assembly The following paragraph presents instructions for installing and adjusting the scale feet. 2.4.1 Installing and Adjusting Feet For load cell protection during shipping, the scale feet are shipped detached from the load cells. The feet are secured to the bottom of the shipping pallet along with the load cell cable, strain relief fitting and product literature. Remove all parts from the envelope.
Electrical Interface to Indicator Twenty feet of 6-wire cable to connect the scale to the weight indicator is supplied with each scale. The cable must be routed to the indicator in a manner that will protect the cable from damage. Two methods of cable protection in non-washdown applications are shown in Figure 4.
7. 8. 9. 10. for repeatability. If necessary, repeat steps 4 and 5. Pull excess cable out of the enclosure and tighten the cord grip assemblies with a wrench. To be watertight, each cord grip must be tightened so the rubber sleeve begins to protrude from the hub. Unused hubs must be properly plugged to prevent moisture entry. See the Electronic Replacement Parts catalog to order extra hole plugs. Remove the desiccant from the plastic bag, and insert the desiccant bag into the junction box before closing.
3.0 3.1 Adjustments and Calibration Mechanical Adjustments To accommodate minor unevenness, scale feet can be used to adjust scale height up or down a fraction of an inch. Adjust the feet using the top access foot adjust holes until all feet are contacting the floor equally. No jam nuts are supplied for locking the feet, as there is a slight decrease in accuracy when jam nuts are tightened.
4.0 4.1 Service Information Troubleshooting Guide System does not operate - no display • • • • Power disconnected: Check and reconnect. Indicator fuse blown. Replace fuse. Check for cause. Interface cable cut or disconnected: Repair.
4.3 Load Cell Replacement Replacement load cell can be ordered from Rice Lake Weighing Systems. Lift scale with chains and proper spreader bar and remove foot, then remove defective load cell. Disconnect load cell cable from junction box and cut cable ties. When the cable is freed, pull cable out of the scale frame channels. Figure 4-1. Load Cell Assembly Follow the directions given below to install new load cells.
30K model: 1.66" Figure 4-3. Foot Pad - Side View Route the load cell cables near each corner so that the cable is free from possible contact with each foot. Hold the cable in position with the adhesive-backed cable ties supplied in the hardware kit. Do not cut load cell cables. Coil extra cable before it enters the junction box, tie with cable ties, and insert the coils into the channel.
RoughDeck Limited Warranty Rice Lake Weighing Systems (RLWS) warrants that all RLWS equipment and systems properly installed by a Distributor or Original Equipment Manufacturer (OEM) will operate per written specifications as confirmed by the Distributor/OEM and accepted by RLWS. RoughDeck fabricated platforms and weldments are warranted against defects in materials and workmanship for five (5) years. Load cells and all other components are warranted for two (2) years.
230 W. Coleman St. • Rice Lake, WI 54868 • USA U.S. 800-472-6703 • Canada/Mexico 800-321-6703 • International 715-234-9171 • Europe +31 (0) 88 2349171 www.ricelake.com www.ricelake.mx www.ricelake.eu www.ricelake.co.in m.ricelake.