User Manual Rev. D - Version 2.4 Instruction Manual

100 Counterpart Counting Scale Indicator
3. Install jumpers on JP5 and JP6. See Table 2-5 on page 16.
4. Plug in power to the Co
unterpart and press the indicators Power button.
5. With Revolution open, begin a new configuration file for the Co
unterpart.
6. Click
Update Counterpart Firmware.
Figure 9-4. Revolution Screen
7. The Rice Lake Updater screen appears. Specify the COM port the Counterpart is connected to, and click
the ellipses (...) to browse to and select the desired .hex file.
Figure 9-5. Rice Lake Updater Screen
8. Click the Program button. The update will take several moments.
9. When complete, remove the jumpers shown in Figure 2-13 on page 15 and press the
Power button to power
up the indicator.