Instruction Manual
Assembly Instructions  
Shed House Style 8 x 8 x 8 
V1.0     
Do NOT Return Assembly To Dealer or Store. For All Questions or Shortages Please Call MDM Products Directly 
Customer Service 800-447-7079 or 203-877-7070 
Assembly Instructions 
Shed Style 8Wx8Lx8H 
Congratulations! 
Congratulations on your purchase of a Shed Style 
Instant Shelter by MDM Products LLC. With proper 
installation, use, and maintenance, your new unit will 
provide many years of good and suitable service. Your 
new MDM Products portable enclosure is a combination 
of excellent engineering and well thought out design. 
The unit is comprised of a rigid tubular frame, covered 
with a long life polyethylene cover and double access 
ends. 
The multiple part tubular frame assembly is pre-drilled 
for easy insertion of hardware to assemble. The tubing 
is made from high-grade galvanized steel tubing, to 
resist moisture and oxidation over the life of the shelter. 
The fabric components are made from ASTM-5 
approved polyethylene materials. The cover is also UV 
protected for continual exposure to the sunlight. 
It is suggested that you read the assembly instructions 
completely
 before you begin. This will help attain the 
best results for your installation the first time. 
SAFETY WARNING 
The installation of this unit must conform to the 
requirements of all authorities having jurisdiction in your 
specific local area. In the absence of such 
requirements, the installation must conform to the 
provided assembly and installation instructions. MDM 
Products LLC will not be responsible for failure to comply 
with any requirements in a given local area. 
Consequential damages or injuries caused by improper 
installation, alteration, or improper use are strictly that of 
the user. Unit MUST be cleared of All Snow 
Accumulation immediately to avoid overload. Unit is not 
to be used for occupancy for any length of time. No 
running internal combustion engines, open flames, or 
contact with heated surfaces are allowed. 
For installation assistance or Customer Service, please 
call 800-447-7079 or 203-877-7070, 8AM-5PM EST. 
Cartons should be inspected upon delivery from carrier, 
and any evident damages should be noted on the bill of 
lading before signing. If upon opening the cartons 
hidden damage is noted, contact carrier or its agent 
immediately. Claims for shipping damage MUST
 be 
made with the shipping company. An inspection of the 
goods will most likely be required. Do not discard 
packing or any components before the freight company’s 
inspection. All claims for freight damage must be made 
with 15 days of receipt of the goods in accordance with 
ICC regulations. 
Assembly Procedure 
The proper sequence and steps to install this unit will 
produce a proper and good installation. Failure to read 
and follow these guidelines may result in an improper 
installation and will void all warranty and protection the 
owner is entitled to with the product. The steps to be 
undertaken are: 
1.  Perform an inventory check before beginning to be certain 
all components are available for installation. 
2.  Prepare location and place both unit boxes near location 
sight. 
3.  Assemble three (3) arches of unit 
4.  Assemble unit end arch, interior arch, and wind braces 
with first top ridge, base cross rail, and side cross rail 
sections. 
5.  Add end arch assembly with sections of top ridge rail, 
base cross rails and side cross rails. 
6.  Place frame into desired position and level
 frame both 
end-to-end and side-to-side. Measure interior of frame 
feet across opposite corners and square as needed. 
7.  Anchor frame assembly to ground with provided anchors, 
u-bolts and drive rod provided. 
8.  Install two(2) doors on both ends of frame assembly. 
9.  Install main cover over frame assembly. 
Tools Required 
The following hand tools are suggested for proper 
installation of your new MDM Products unit: 
9/16” Open End Wrench 
  9/16” Socket or Box Wrench 
  Large Flat Tip Screwdriver 
  Maul or Sledgehammer 
 2-foot Level 
  6-Foot Step Ladder 
Inventory Check 
Start installation procedure by removing all components 
from packaging and ensure all components are present 
Number Qty Description 
1  6  Bent Side Tube Crest 
2  3  Top Crest Support 
3  4  End Upright w/Foot 
4  2  Center Straight Upright 
5  5  Cross Rail A – Top, Side, Base
6  5  Cross Rail B – Top, Side, Base
7  2  Corner Wind Brace 
8  15  3/8” x 3.25” Carriage Bolt 
9  8  3/8” x 2.125” Carriage Bolt 








