Instructions / Assembly

11
For increased energy efficiency, some
water heaters have been supplied with
a 2-3/8” section of pipe insulation.
Please install the insulation, according
to the illustrations above, that best
meets your requirements.
Slip the insulation cover over the
T&P Valve through the center hole
and align the hole in the side with the
opening of the T&P Valve.
Typical top connection arrangement
Relief Valve Insulation Installation
!
CAUTION: Ensure the
T&P Valve opening is not
obstructed by the
insulation.
Heat Trap
For increased energy efficiency, some
water heaters have been supplied with
factory installed internal or external
heat traps in the hot outlet and cold
water inlet openings.
NOTICE: DO NOT apply heat to the
HOT or COLD water connections.
If sweat connections are used, sweat
tubing to adapter before fitting adapter
to the water connections on heater. Any
heat applied to the water supply fittings
will permanently damage the dip tube
and/or heat traps.
For increased energy efficiency, some
water heaters have been supplied with
two 24” sections of pipe insulation.
Please install the insulation, according
to the illustrations above, that best meets
your requirements.
Typical vertical piping arrangement
Typical horizontal piping arrangement
Hot and Cold Pipe Insulation Installation