Operating instructions
EZ-LINK SYSTEM DUAL INSTALLATION 
50 
DUAL INSTALLATION 
The two continuous flow water heaters can be installed side by side with minimal clearance between them. 
The AGA has approved the installation of two of this model water heater with an exemption from the 300 mm 
minimum clearance requirements between flue terminals, as stated in AS/NZS 5601, clause 5.13.6.5 and 
AS/NZS 5601.1, clause 6.9.3. 
Install two continuous flow water heaters of the same model in a parallel plumbing arrangement. It is good 
practice, but not essential, to install the two water heaters in an Equa-Flow
®
 manifold plumbing arrangement. 
There are basic installation requirements which must be followed: 
1.  The pipe work must be sized to meet the requirements of both AS/NZS 3500.4 and the application. It is 
recommended to use minimum DN25 pipe for the cold water line, cold and hot headers and hot water 
line and DN20 for the cold and hot water branch lines of each water heater. 
2.  A full flow gate valve or ball valve must be installed on the cold water line to the system. A non return 
valve or stop tap must not be installed. 
3.  A full flow gate valve or ball valve (not a stop tap) should be installed on both the cold water branch and 
hot water branch of each water heater. 
4.  An isolation valve must be installed on the gas branch of each water heater. 
5.  Non return valves or pressure limiting valves must not be installed on the branch lines to the water 
heaters. 
6.  All fittings, valves and branch lines should be matched sets to each of the water heaters. 
7.  Sufficient space must be left to enable access, servicing or removal of either water heater. 
Refer to the ‘Typical Two Unit Manifold with Ez-Link Connection’ diagram on page 52 for installation and 
plant layout details. 
LABELS 
A warning label (121109) and an AGA approval label (121901) are 
supplied in the Ez-Link kit. Where the two water heaters are installed close 
together and the warning label and AGA approval label on the inside face 
of the right hand water heater cannot be read, it is necessary to adhere the 
two labels supplied to the right-hand face of the water heater. 
1.  Place the warning label below the rating label. 
2.  Place the AGA approval label beside the barcode label. 
Refer to the ‘Label Positioning’ diagram on page 50 for the position of the 
two labels to be adhered to the water heater. 
A second rating label is attached to the inside of the front cover. This can 
be referenced to determine details of the left hand water heater. 
TEMPERATURE CONTROLLER 
A temperature controller is required to be installed with the EZ-Link system. If a temperature controller is not 
installed, neither water heater will operate. 
Connect a temperature controller to one only of the two water heaters. Up to three temperature controllers 
can be installed to this water heater. Refer to “Installation – Controllers” on page 56. 
The water heater connected with the temperature controller(s) will become the “master” water heater. The 
installed temperature controller(s) will control the temperature and functionality of both water heaters. The 
maximum outlet temperature of the water heaters will be limited by the maximum temperature setting of the 
temperature controller. 
Special requirements apply if two continuous flow gas water heaters have been Ez-Linked together and they 
are part of a circulated hot water flow and return system in a building. Refer to “Circulated Hot Water Flow 
And Return System” on page 40. 
Label Positioning 